My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Walsh Construction Company II LLC 6/7/2021
>
Contracts
>
Capital Contract
>
Walsh Construction Company II LLC 6/7/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2023 3:53:32 PM
Creation date
6/10/2021 3:42:47 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Walsh Construction Company II LLC
Approval Date
6/7/2021
Council Approval Date
4/21/2021
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Replacement of Reservoir 2
Public Works WO Number
UP3658
Tracking Number
0002940
Total Compensation
$0.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Walsh Construction II, LLC 8/24/2023 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Walsh Construction II, LLC 8/7/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1466
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
On Drawing M4, replace sheet note 1 with the following: <br /> "RESERVOIR ROOF VENT SHALL BE PRESSURE/VACUUM RELIEF STYLE W/ALUMINUM SHROUD FOR <br /> 36-INCH OPENING, MODEL 36 AST ROOF VENT AS MANUFACTURED BY ADVANCE TANK AND <br /> CONSTRUCTION CO. OR APPROVED EQUAL, W/ADAPTER FOR MOUNTING TO SQUARE CONCRETE <br /> CURB." <br /> On Drawing E13, in the circuit schedule, REPLACE circuit 25 with the following: <br /> Ckt# From To Conductors Raceway Notes <br /> ' 25 Panel "A" Valve House 2 --- 2 Provide Dedicated Conduits <br /> W/Pull Cord From Panel "A" <br /> To First Vault& From Last <br /> Vault To Valve House. <br /> Clarification to Drawing CD8; <br /> For Detail 3, the rebar shown connecting the pre-cast concrete block to the concrete membrane <br /> slab shall be installed via drill and epoxy methods. <br /> Clarification to Drawings SR3 and SR4: <br /> The above two drawings reference monolithic roof and floor slabs. It is acceptable to place the <br /> roof and floor slabs in halves. The roof joint shall be oriented so that it does not intersect the <br /> 12'x14' hatch opening. Additional detailing (provided by Contractor during construction) shall be <br /> ' submitted to the Engineer for approval for the joint to jog around the roof vent at the center of <br /> the slab. Coordination via RFI shall be required for the floor joint location on the west reservoir <br /> due to floor penetrations. A control joint detail is included for Contractor use. <br /> All other requirements of the contract documents remain in effect. <br /> City of Everett <br /> O ti�f•p4 M��lo� <br /> �SIOh%qj,...cnC <br /> Souheil Nasr, P.E. <br /> Project Manager <br /> I <br /> Addendum 4 Page 3 <br /> CITY OF EVERETT • 3200 Cedar Street • Everett, WA 98201 • (425) 257-8800 • Fax (425) 257-8882 <br />