My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Walsh Construction Company II LLC 6/7/2021
>
Contracts
>
Capital Contract
>
Walsh Construction Company II LLC 6/7/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2023 3:53:32 PM
Creation date
6/10/2021 3:42:47 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Walsh Construction Company II LLC
Approval Date
6/7/2021
Council Approval Date
4/21/2021
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Replacement of Reservoir 2
Public Works WO Number
UP3658
Tracking Number
0002940
Total Compensation
$0.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Walsh Construction II, LLC 8/24/2023 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Walsh Construction II, LLC 8/7/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1466
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NM Mil Mill Ell <br /> � <br /> Bidder Comments Form <br /> Document Title: Replacement of Reservoir 2 Bidder Question Log Date: 3/3/2021 <br /> Item <br /> No. Dwg/Fig No, Reviewer's Comments Comment by Designer's Response <br /> Drawings,Specs,Report or Other Document(Refer to document below in Comments) <br /> ENTER SHEET <br /> NUMBER OR SPEC <br /> NUMBER BIDDER COMMENTS COMPANY RESPONSE <br /> See Addednum No 4 <br /> Tank subcontractors are expecting durations of 12 months to complete tank construction.We <br /> do not believe that the 360 working day duration leaves sufficient time for mobilization,tank Walsh Group <br /> excavation,tank constriction,tank testing,water main tie-Ins,and de-commissioning of the <br /> existing Reservoir.Will the City consider increasing the project duration to 425 working days. <br /> Corrrect,BI 1117 is for 26 05 00-1.8(C) <br /> Specification 26 05 00-1.8(C)reads, <br /> "The Contractor shall include an additional,separate line item of$50,000 for power and <br /> communication utility fees within the electrical bid item.This amount shall be for all utility <br /> service and construction fees related to the re-routing of the existing primary power and Walsh Group <br /> communications circuits,currently in conflict with the locations for the new reservoir tanks. <br /> Actual cost shall be adjusted and billed to the project during construction." <br /> Bid item 17"Utilities Coordination"calls for a lump sum contract price of$50,000.Is bid item 17 <br /> covering the cost associated with the specification 26 05 00-1.8(C)? <br /> Specification 26 05 00-1.8(B)reads, See Addednum No 4 <br /> "The Contractor shall Include a line item of$10,000 for power utility fees within the <br /> electrical bid item.This amount shall Include all utility service and construction fees related to <br /> the provision of new electrical service for the storage building and reservoir. <br /> Actual cost shall be adjusted and billed to the project during construction." Walsh Group <br /> There is no bid item provided for this amount.Is this to be included in the Lump Sum price of Bid <br /> Item 16"Electrical and Instrumentation",or will it need to be broken out into a different bid <br /> item? <br /> Please confirm what the 34"RE line shown on the southside of sheet 9(D120)in the contract Graham 34"RE line is existing,and not part of this project. <br /> drawings contains. <br /> Please confirm the intent of the 2"Drain on drawing sheet SP130.Is this existing? Graham This is the Reservoir 4 underdrain sump pump discharge line as shown on sheet C730 <br /> For the existing reservoir 2 wall w/the 1"conduit attached to it,please clarify if it will stay in <br /> place.Will we only be sawcutting the concrete liner within reservoir 2 and keep the existing wall Graham The existing Reservoir 2 wall and conduit will stay in place.Sawcutting will only be performed on the existing Reservoir 2 concrete <br /> In place? floor per sheet D171. <br /> On sheet C140,where does the curb and gutter end?It does not specify the start and end Graham Concrete curb and gutter on sheet C140 starts at the NW corner of the overlay and ends directly South where the plan sheet shows <br /> curb/gutter on the drawings such as the other civil drawings, the curb stopping. <br /> On sheet CD8-Detail 3 shows an Overflow/SD Discharge to Reservoir 4 pipe concrete support <br /> pad and blocks.The detail states the pad is to be CIP and the blocks are to be Pre-Cast.It looks Walsh Group <br /> like there is a rebar connection between the two concrete elements,but there is no call out for <br /> how the two supports connect.Are these drill and dowel connections?Please review and verify <br /> connection between precast blocks and CIP Concrete slab. See Addendum No 4 <br /> On sheet CD8-Detail 1 shows the Trench drain detail.The concrete around the trench drain Walsh Group <br /> does not call out any rebar.Please confirm that the Trench Drain concrete has no rebar in it. See Addednum No 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.