My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Walsh Construction Company II LLC 6/7/2021
>
Contracts
>
Capital Contract
>
Walsh Construction Company II LLC 6/7/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2023 3:53:32 PM
Creation date
6/10/2021 3:42:47 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Walsh Construction Company II LLC
Approval Date
6/7/2021
Council Approval Date
4/21/2021
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Replacement of Reservoir 2
Public Works WO Number
UP3658
Tracking Number
0002940
Total Compensation
$0.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Walsh Construction II, LLC 8/24/2023 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Walsh Construction II, LLC 8/7/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1466
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. The basic seismic system shall consist of the seismic controller, motorized valve actuator <br /> model Auma, and DC power supply. The system shall be capable of withstanding severe <br /> field conditions such as extreme temperature variation (— 10 degrees Fahrenheit (F) to <br /> +150 degrees F), providing local and remote valve control, and reporting valve position <br /> via motorized actuator. The system shall continue to operate for at least ten full cycles <br /> when outside power sources fail and maintain the ability to control the valve. The <br /> seismic system manufacturer shall be responsible for integration of all the seismic <br /> system's components. <br /> Replace paragraph 2.3, B with the following: , <br /> B. Terminal connections shall be provided for connection to SCADA. The following seismic ' <br /> equipment parameters will be provided for the SCADA system to monitor and control: <br /> 1. Arm/trip status ' <br /> 2. Remote arm <br /> 3. Valve open/close status (future use) <br /> 4. Power supply status <br /> 5. Power supply status to actuator <br /> VOLUME 1, DIVISION 26 — ELECTRICAL ' <br /> SECTION 26 05 33, RACEWAYS AND BOXES <br /> Replace paragraph 3.1, C with the following: <br /> C. Provide rigid steel conduit for raceways embedded in structural reinforced concrete, ' <br /> below floor slabs-on-grade, for exposed installations where subject to damage, for sizes <br /> 1.25-inch and larger, and at all locations not otherwise specified. <br /> Replace paragraph 3.1, C, 2 with the following: <br /> 2. Use PVC-RGS in corrosive locations and hazardous (classified) areas unless otherwise <br /> noted. PVC or fiberglass conduit may be used under concrete slabs, where approved by <br /> the engineer. <br /> VOLUME 2, DIVISION 33 — UTILITIES , <br /> SECTION 33 11 10.46, STEEL PIPE, LINED AND COATED $ <br /> Replace paragraph 2.4, E, 2 with the following: <br /> 2. Provide the following welded joints: <br /> Addendum 5 Page 2 1 <br /> CITY OF EVERETT • 3200 Cedar Street • Everett, WA 98201 • (425) 257-8800 • Fax <br /> (425) 257-8882 111 <br />
The URL can be used to link to this page
Your browser does not support the video tag.