My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Walsh Construction Company II LLC 6/7/2021
>
Contracts
>
Capital Contract
>
Walsh Construction Company II LLC 6/7/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2023 3:53:32 PM
Creation date
6/10/2021 3:42:47 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Walsh Construction Company II LLC
Approval Date
6/7/2021
Council Approval Date
4/21/2021
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Replacement of Reservoir 2
Public Works WO Number
UP3658
Tracking Number
0002940
Total Compensation
$0.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Walsh Construction II, LLC 8/24/2023 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Walsh Construction II, LLC 8/7/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1466
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> transformer. The motor shall be 1-phase, 120 Volt, unless indicated otherwise. The <br /> actuator shall be an AUMA without exception to maintain consistency and uniformity with <br /> OWNER'S existing electric actuators. A selector switch (local/off/automatic) and three <br /> push- button control switches (open/stop/close), both mounted remotely, shall be <br /> provided if so required elsewhere in the contract documents. <br /> VOLUME 3, DRAWINGS <br /> Replace the following 8 drawings in their entirety with the attached 8 drawings: <br /> 1. E2 <br /> 2. E3 <br /> 3. E4 <br /> 4. E9 <br /> 5. E10 <br /> 6. E10A <br /> 7. E13 <br /> 8. E14 I <br /> On drawing CP1, replace the two tables with the two tables below: <br /> BONDING JUMPER SCHEDULE -BETWEEN PIPELINE <br /> SEGMENTS , <br /> DRAWING <br /> FROM TO NO. <br /> 24" W AA0+30 E1+12 C420 ' <br /> 24" W E4+70 <br /> NORTH 24" W E4+70 CENTRAL C430 <br /> EXIST. NEG J.BOX <br /> 36" W A0+70 <br /> CHLORINE BLDG C430 <br /> 1 <br /> 1 <br /> Addendum 5 Page 4 ' <br /> CITY OF EVERETT • 3200 Cedar Street • Everett, WA 98201 • (425) 257-8800 • Fax <br /> (425) 257-8882 <br />
The URL can be used to link to this page
Your browser does not support the video tag.