My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Walsh Construction Company II LLC 6/7/2021
>
Contracts
>
Capital Contract
>
Walsh Construction Company II LLC 6/7/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2023 3:53:32 PM
Creation date
6/10/2021 3:42:47 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Walsh Construction Company II LLC
Approval Date
6/7/2021
Council Approval Date
4/21/2021
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Replacement of Reservoir 2
Public Works WO Number
UP3658
Tracking Number
0002940
Total Compensation
$0.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Walsh Construction II, LLC 8/24/2023 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Walsh Construction II, LLC 8/7/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1466
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MN I MI <br /> Bidder Comments Form <br /> Document Title: Replacement of Reservoir 2 Bidder Question Log Date 3/10/2021 <br /> Item <br /> No. Dwg/Fig No. Reviewer's Comments Comment by Designer's Response <br /> Drawings,Specs,Report or Other Document(Refer to document below in Comments) <br /> ENTER SHEET <br /> NUMBER OR SPEC <br /> NUMBER BIDDER COMMENTS COMPANY RESPONSE <br /> 1.Specification section 33 11 10.46 paragraph 2.4 A.States,"Provide steel pipe,shop lined and Butt strap joints are to be used on all steel pipe joints <br /> coated,with standard welded lap joints unless otherwise shown on the Drawings."Same spec <br /> 1 section paragraph 2.4 E 2.States,"Provide butt strap joints with air test connections unless Walsh <br /> indicated otherwise on the Drawings."The specs goon further to discuss lap joints and bell <br /> ends,but the drawings only show a Butt Strap Joint Detail.Please confirm what joint type is to <br /> 33 1110.46 be used on this project either lap joint or Butt strap. <br /> Heat shrink sleeves <br /> 2.Specification section 33 11 10.46 3.4 B through E discuss a field joint coating system to be <br /> preformed at each joint This description is an exterior gout band seal and is not shown on the <br /> 2 details of the joints on plan sheet CD10.Please confirm If this field joint coating is required and <br /> provide a detail indicating the dimensions for the Joint coatings.The current detail for the butt Walsh <br /> strap joint detail only shows a heat shrink sleeve and not a grout coating with polyethylene <br /> foam-lined fabric bands.Please clarify what is required at the exterior of the joints and detail on <br /> 33 11 10.46 the plan sheets accordingly so contractors can price the project correctly <br /> Details below show the butt strap joint detail for 30",36"and 48"Pipe.Can you confirm the Detail 9"24"Dia and Smaller Butt Strap Joint Detail"is to be used for the 24 inch welded joints.The detail shows a handhcle that <br /> 3 joint to allow for access and Graham will be placed In one single location at each applicationPP of field applied cement mortar of the joint. <br /> detail for the 24 Inch Welded joints as it appears unclear in the draiwngs and specifications. <br /> 4 Is It possible to get more information on what the Terminal.1-box on drawing E2 needs to be? Terminal box Is to include power terminals for hard-wiring connection of portable generator. <br /> We need to know if it is Just a 1-box or if It has something in it? Dalton Elect <br /> See Addendum No 5 <br /> Under Part 1 General,Description B,the actuator is listed as requiring an AC Power <br /> Supply.FLO-LOC requests clarification on the Power Supply,related to the actuator. <br /> 5 Who is supplying the UPS for the AC actuator?FLO-LOC does not supply UPS systems Beaver Equip <br /> and only provides the battery backup,when the actuator is 24VDC power supply.The <br /> 24VDC power supply system uses a battery backup which provides ten full cycles when <br /> outside power sources fail and maintain the ability to control the valve. <br /> Under Part 1 General,Description B,"...providing local and remote valve control,and See Addendum No 5 <br /> 6 remote valve control,and reporting valve position".How is this to be done?Is the <br /> actuator to send the local,remote,and valve positioning directly to SCADA?Please let Beaver Equip <br /> us know. <br /> Seismic Controller B,"4.Power supply status". Is the intent for FLO-LOC to provide the See Addendum No 5 <br /> 7 power supply status of the seismic controller,which has its own self-contained power Beaver Equip <br /> supply? <br /> See Addendum No 5 <br /> 8 Seismic Controller B,"5.Power supply status to actuator",FLO-LOC only supplies the Beaver Equip <br /> "Power supply status to actuator",when they provide 24VDC backup power systems. <br /> 9 Under Division 40,Specification Section 40 05 57 what is the actuator cycle speed <br /> specified? Beaver Equip <br /> In the Electrical drawings,where is the detail showing the seismic controller(panel)? See Addendum No 5 <br /> 10 Once FLO-LOC has clarification on the above-listed questions,they will provide Beaver Equip <br /> electrical information for their seismic controller(panel). <br /> 11 What Is the span of the bridge crane? WA Crane and 22'-4" <br /> Hoist <br /> 12 What is the power supply for the bridge crane? WA Crane and Panel A shows power as 240 V,single phase. <br /> Hoist <br />
The URL can be used to link to this page
Your browser does not support the video tag.