Laserfiche WebLink
8. Yard Piping and Fittings <br /> Measurement and Payment: Lump Sum <br /> Payment for Yard Piping and Fittings shall be at the lump sum price named in the <br /> Proposal, which payment shall constitute full compensation for all material, <br /> labor and equipment, complete and in place, for work necessary to install all <br /> water, sewer and drain piping, overflow piping and manholes including, but <br /> 111 <br /> not limited to, trench excavation, furnishing and installing pipe, valves, fire <br /> hydrant assemblies, fittings and appurtenances, bedding and backfill, <br /> compaction, HMA trench patch, surface restoration, thrust restraint, testing, I <br /> disinfection, flushing and dechlorination of water used for flushing and <br /> cleanup. Excluded from this bid item are ring and foundation drains, concrete <br /> thrust blocking, and thrust restraint on existing piping, included in other bid I <br /> items. <br /> Progress payments for Yard Piping will be based on the percentage of this Work I <br /> completed, as approved by the OWNER. <br /> Two, 2.5 MG Prestressed Concrete Tanks (AWWA D110, Type I) & <br /> Accessories <br /> Measurement and Payment: Lump Sum I <br /> Payment for two, 2.5 MG Prestressed Concrete Tanks (AWWA D110, Type I) & <br /> Accessories shall include all costs for constructing both, 2.5 MG Prestressed <br /> Concrete Tanks (AWWA D110, Type I), including all internal and external <br /> accessories, as shown and described in the Contract Documents in order to make <br /> the project complete. Payment shall be based on the lump sum unit price named I <br /> in the Proposal, which payment shall be considered full compensation for all tools, <br /> equipment, materials, manufacturing, transporting, delivering, handling, storing, <br /> installation, and labor required for constructing, coating, testing, disinfecting, I <br /> flushing, dechlorination, and disposal of disinfecting water for both 2.5 MG <br /> Prestressed Concrete Tanks. Payment shall include all excavation, disposal of <br /> excess material, imported backfill material, ring and foundation drain piping, <br /> underlain liners and geotextiles, hydrodynamic mixing system, overflow, interior <br /> staircase, exterior staircase, and walkway connecting the two reservoirs. <br /> 111 <br /> Progress payments for two, 2.5 MG Prestressed Concrete Tanks (AWWA DUO, <br /> Type I) will be based on the percentage of this Work completed, as approved by <br /> the OWNER. I <br /> 3:10. Over-excavation <br /> Measurement and Payment: Cubic Yards <br /> I <br /> Replacement of Reservoir 2 Measurement and Payment <br /> WO# UP3658 01 22 00 - 6 <br />