Walsh Construction Company II LLC 6/7/2021
>
Contracts
>
Capital Contract
>
Walsh Construction Company II LLC 6/7/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2023 3:53:32 PM
Creation date
6/10/2021 3:42:47 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Walsh Construction Company II LLC
Approval Date
6/7/2021
Council Approval Date
4/21/2021
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Replacement of Reservoir 2
Public Works WO Number
UP3658
Tracking Number
0002940
Total Compensation
$0.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Walsh Construction II, LLC 8/24/2023 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Walsh Construction II, LLC 8/7/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1466
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the unit price shall be made if the Reservoir 4 underdrain is at a different depth. <br /> The adjustment shall be an increase/decrease based on the percentage difference <br /> between the actual Reservoir 4 underdrain depth and the depth assumed above. <br /> Progress payments for Underdrain Sump Pump will be based on the percentage of <br /> this Work completed, as approved by the OWNER. <br /> 16.17. Electrical and Instrumentation <br /> Measurement and Payment: Lump Sum <br /> Payment for Electrical and Instrumentation shall be at the lump sum price named <br /> in the Proposal, which payment shall constitute full compensation for all permits, <br /> tools, labor, equipment, and materials to provide electrical services and <br /> instrumentation to all facilities as shown on the drawings and specifications, <br /> including electrical service, site lighting, security system, instruments, conduits and <br /> wiring. <br /> Progress payments for Electrical and Instrumentation will be based on the <br /> percentage of this Work completed, as approved by the OWNER. <br /> 318. Utilities Coordination <br /> ' Measurement and Payment: Lump Sum <br /> Payment for Utilities Coordination shall constitute full compensation for all work <br /> required by Snohomish PUD to install primary conductors to Snohomish PUD <br /> standards. Excluded from this work is furnishing and installing conduits, pull boxes, <br /> €4This shall include all re-routing of the existing primary power and communication <br /> circuits and new electrical service for the storage building and reservoir. <br /> Progress payments for Utilities Coordination shall be based on actual work <br /> performed. <br /> 18.19. Testing, Startup and O&M Manual <br /> ' Measurement and Payment: Lump Sum <br /> Payment for Testing and Startup shall be based on the lump sum unit price named <br /> in the Proposal, which payment shall be considered full compensation for all tools, <br /> equipment, labor, materials, and incidentals necessary to complete this work as <br /> specified herein; including all testing services, startup time and coordination, and <br /> operations manual per specifications. <br /> Replacement of Reservoir 2 Measurement and Payment <br /> WO# U P3658 01 22 00 - 9 <br />