Progress payments for HMA CL%" PG 58H-22 Grind and Overlay shall be based on <br /> the full completion of each unit price, as approved by the OWNER. I <br /> 13.14. Final Grading and Site Work <br /> Measurement and Payment: Lump Sum <br /> Payment for Final Grading and Site Work shall be based on the lump sum unit price <br /> named in the Proposal, which payment shall be considered full compensation for <br /> all permits, tools, equipment, labor, materials, and incidentals necessary to <br /> complete this work as specified herein; including all gravel access roads, asphalt <br /> pavement, concrete sidewalks, fencing and gates,final grading,trench restoration, <br /> surface restoration, landscaping and planting and seeding. <br /> Progress payments for Final Grading and Site Work will be based on the percentage <br /> of this Work completed, as approved by the OWNER. <br /> 44-15. Storage Facility <br /> Measurement and Payment: Lump Sum <br /> Payment for Storage Facility shall be based on the lump sum unit price named in <br /> the Proposal, which payment shall be considered full compensation for all permits, <br /> tools, equipment, labor, materials, transporting, delivering, handling, storing, <br /> installation,testing, cleanup, and incidentals necessary to construct a CMU storage <br /> facility building with concrete foundation, metal roofing, bridge crane, HVAC and <br /> plumbing systems, chlorine sampling equipment, roof drains and footing drains, <br /> and all other items shown in the Architectural and Storage Facility drawings. <br /> Progress payments for Storage Facility will be based on the percentage of this Work 111 <br /> completed, as approved by the OWNER. <br /> 4-5-16. Underdrain Sump Pump 1 <br /> Measurement and Payment: Lump Sum <br /> Payment for Underdrain Sump Pump shall be at the lump sum price named in the <br /> Proposal, which payment shall constitute full compensation for all permits, tools, <br /> equipment, labor, materials, and incidentals necessary to complete this work as <br /> specified herein; including all excavation and shoring, furnish and install sump <br /> pump, discharge piping, concrete pipe, access hatch, backfill, <br /> abandonment/removal of existing underdrain piping, and temporary <br /> piping/pumping as required to install the system as shown in the contract drawings. <br /> For the purposes of bidding, assume the existing Reservoir 4 underdrain is 20-feet 1 <br /> below surface grade at the location of the underdrain sump pump. Adjustment to <br /> Replacement of Reservoir 2 Measurement and Payment <br /> WO# UP3658 01 22 00 - 8 <br />