My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Walsh Construction Company II LLC 6/7/2021
>
Contracts
>
Capital Contract
>
Walsh Construction Company II LLC 6/7/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2023 3:53:32 PM
Creation date
6/10/2021 3:42:47 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Walsh Construction Company II LLC
Approval Date
6/7/2021
Council Approval Date
4/21/2021
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Replacement of Reservoir 2
Public Works WO Number
UP3658
Tracking Number
0002940
Total Compensation
$0.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Walsh Construction II, LLC 8/24/2023 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Walsh Construction II, LLC 8/7/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1466
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> I <br /> GENERAL NOTES <br /> ' A.SEE SHEET E13 FOR CIRCUIT SCHEDULE. <br /> HP-2--Ni - ` <br /> 4"C • <br /> • ®����� TO VAULT ELECTRICAL <br /> T <br /> I <br /> • ANTENNA �Q� I• INTRUSION(DOOR) <br /> //- „ ® AH-2 SWITCH KEY NOTES <br /> - .--:—' O 1-B0X FOR FUTURE KEY PAD. <br /> �S ' s•� '=, E/ONE PANEL <br /> - SPC SPC - __ V — O2 WITHOUT <br /> LOW ONER DOOR.G INSTALL 50 THAT DOOR CAN BE FULLY OPENED <br /> v I `4- WITHOU7INTERFERING WITH PROPER DOOR SWITCH OPERATION, <br /> ANALYERS 1 © 53 AH 2 INCLUDING"STRIKE PLATE"(IF ANY). <br /> MAIN <br /> 0.111 <br /> COSCADA PLC <br /> I CABINET MThTERMINAL)-BOX <br /> AH-1 (SPC) <br /> <�� <br /> I HP1� <br /> jam—PANEL°A" <br /> 0 1 <br /> LCP <br /> SEISMIC <br /> 0SENSOR PANEL <br /> I <br /> - SPC <br /> I ' <br /> et <br /> I SMOKE 1 1 <br /> DETECTOR INTRUSION <br /> (1YP) (DOOR) <br /> SWITCH <br /> AH-1 <br /> a <br /> SPC - SCP <br /> II <br /> ()INTRUSION 1 <br /> L 3 (DOOR) TO <br /> SWITCH POLE-MOUNT <br /> aCAMERAS <br /> STORAGE ROOM & MEZZANINE SIGNAL FLOOR PLAN SCADA ROOM SIGNAL FLOOR PLAN <br /> 8 <br /> SCALE: 1/4°=1'-O' SCALE: 112"=1'-0' -� <br /> C 2 <br /> Ile <br /> ir_ ,.„ <br /> ._., <br /> ...„.„ <br /> i »1 es,ssw.rme..m <br /> a o O LLJ^J<vJ\ sraa� <br /> Rowrtn,4°5m 9Rp6 <br /> Fbry: <br /> c F:NODZFRING,INC.F-" 00w...- <br /> -F EERI d5ehINC EmN: <br /> $ PK,.W.:461121.021 Contact sF HOWARD <br /> a f- <br /> E 'i I I I DrsR;^M ,D L.yo <br /> al Drawing <br /> -- °�^ NMS fC�%W" � E V E R E T T REPLACEMENT OF RESERVOIR 2 ELECTRICAL E10A <br /> �j3/S/2021 1LH ;PER ADDENDUM NO.S tredue m1 !/~P 2� ` PUBLIC WORKS Sheet Na. <br /> NO.I DATE APRVD REVISION 0t6i6"R"`�"�� murra vsmi7h <br /> PLANS ISSUED FOR p , *2,,1 �'� J ` 32000ednrStreet BUILDING SIGNAL PLANS 120 <br /> _ L BID I CONST RECORD SRED' ��-'� 2 Everett,WA98201 WORK ORDER UP3658 <br /> a L I ; 5T <br /> S70NAL��n��7 425.257.8800 everettwD.gov 126 <br /> ACTION I DATE I APRVD ACTION DATE I APRVD ACTION DATE APRVD Of rodi <br /> N <br />
The URL can be used to link to this page
Your browser does not support the video tag.