<br /> CRY OF EVERETT RESERVOIR 2 CIRCUIT FROM TO CONDUCTORS RACEWAY NOTES
<br /> I
<br /> ELECTRICAL CIRCUIT SCHEDULE ���.--. ^_^^^^^^^_^^ ^^_ _ ^^^^^
<br /> SEISMIC VALVE SCADA/CONTROL (2)30 AWG,P 1.5 OPEN CLOSE CMD,OPEN/CLOSED LIMIT SW'S,
<br /> ALL CIRCUITS ARE IDENTIFIED ON THE PLANS WITH THE DIAMOND SYMBOL CONDUCTOR SIZES ARE BASED ON COPPER CONDUCTORS. •31 MOTORIZED ACTUATOR PANEL (12)14AWG,C SW'S,LOCAL/REMOTESW
<br /> CONDUIT SIZES ARE SHOWN FOR CASES WHEN CIRCUIT CONDUCTORS ARE RUN WITHOUT OTHER CIRCUITS.MULTIPLE CIRCUITS RUN Imo/ (SIGNALS) (6)14 AWG,SP ALL SIGNALS 24VDC,INCLUDING POWER. 1
<br /> IN COMMON CONDUITS ARE SHOWN ON PLANS AND SUPERSEDE THE BASIC CONDUIT SIZE SHOWN. 1%� (1)10 AWG,G 24VDC PWR FROM SEISMIC SENSOR PNL /\
<br /> ( SCADA/CONTROL SEISMIC SENSOR (2)10 AWG,P 1.5 24VDC POWER OUT TO SEISMIC VALVE J
<br /> RACEWAY SIZES ARE IN INCHES WITH QUANTITIES IN EXCESS OF(1)SHOWN IN ADJACENT PARENTHESIS.CONDUCTOR CONFIGURA- ( •31A PANEL PANEL (12)14 AWG,C ACTUATOR,VIA SCADA/CONTROL PNL
<br /> I TIONS ARE CODED AS FOLLOWS:P-FOR POWER CONDUCTORS,G-FOR GROUND CONDUCTORS,N-FOR NEUTRAL CONDUCTORS, r (6)14 AWG,SP vv vvv
<br /> C-FOR CONTROL CONDUCTORS,AND SP-FOR SPARE CONDUCTORS. \ (1)10 AWE;G....._,...._,........ v )
<br /> �--v AKONtRotw`_^-"(4)14 AWG,S
<br /> CIRCUITS REVISED SINCE LAST ISSUE ARE INDICATED BY AN ASTERISK)'). 32 HATCH SWITCHES PANEL (4)14 SP
<br /> CIRCUIT FROM TO CONDUCTORS RACEWAY NOTES (INTRUSION) (1)12 AWG,G
<br /> NUMBER
<br /> BACKFLOW VAULT SCADA/CONTROL (2)14 AWG,C 1
<br /> ' UTILITY PRIMARY PAD-MOUNTED — 2 PROVIDE PULL CORD. —33 FLOAT SWITCH(FLOOD) PANEL (2)14 AWG,SP
<br /> 1 VAULT UTILITY XFMR (1)12 AWG,G
<br /> RESERVOIR 4 VALVE SCADA/CONTROL
<br /> (12) AWG,C 1.5 OPEN/CLOSE CMD,OPEN/CLOSED LIMIT
<br /> PAD-MOUNTED
<br /> 2 UTILITY XFMR METER BASE (2)3/0 AWG,P 2.5 34 ACTUATOR
<br /> (SIGNALS) PANEL (6)14 AWG,SP SW'S,LOCAL/REMOTE SW
<br /> (1)3/OAWG,N
<br /> (1)12 AWG,G ALL SIGNALS 24VDC
<br /> BUILDING POLE SCADA/CONTROL (2)CAT.6 CABLE 2 ONE CAT.6 CABLE IS"SPARE".
<br /> METER BASE MAIN CIRCUIT (2)3/0 AWG,P 2 35 MOUNT CAMERA PANEL (1)12 AWG,G CAMERA IS POE POWERED.
<br /> I
<br /> 3 BREAKER(MCB) (1)3/0 AWG,N
<br /> MAIN ECIRCUIT MANUAL TRANSFERNORTH RESERVOIR SCADA/CONTROL (2)14 AWG,C 1
<br /> (2)3/O AWE.P 2 36 HATCH"A"SWITCH PANEL (2)14 AWG,SP
<br /> 4 BREAKER(MCB) SWITCH(MIS) (1)3/0 AWG,N ,(INTRUSION) (1)12 AWG,G
<br /> (1)4 AWG,G NORTH RESERVOIR SCADA/CONTROL —,
<br /> PORTABLE GENERATOR MANUAL TRANSFER (2)3/0 AWG,P 2 37 HATCH"B"SWITCH PANEL 12)14 A1)14 AWG,
<br /> C 3
<br /> SP
<br /> 5 TERMINAL BOX SWITCH(MIS) (1)3/0 AWG,N (INTRUSION) (1)12 AWG,G
<br /> (1)4 AWE,G NORTH RESERVOIR SCADA/CONTROL (2)14 AWE,C 1 _ —
<br /> MANUAL TRANSFERPANEL"A" (213/OAWG,P 2 38 HIGH LEVEL FLOA75W PANEL (3J 14AWG,SP
<br /> 6 SWITCH(MIS) (i)3/O AWE,N
<br /> (1f 4AWG,G NORTH RESERVOIR SCADA/CONTROL ((1 1 AWG,G
<br /> PANEL"A" E/ONE GRINDER (1)12 AWG,P 3/4 39 LEVEL SENSOR"A" PANEL 1)16 TSP,SP
<br /> 1
<br /> 7 PUMP CONTROL (1)12 AWG,N (1)16 AWE,
<br /> (1)12 AWG,G
<br /> PANEL(CP) (1)12 AWG,G NORTH RESERVOIR SCADA/CONTROL
<br /> (1)
<br /> TSP,P,SP
<br /> C 1
<br /> E/ONE GRINDER GRINDER PUMP (1)12 AWG,P 1 40 LEVEL SENSOR"B" PANEL
<br /> 8 PUMP CONTROL (1/4 HP) (1)12 AWG,N (1)12 AWG,G
<br /> PANEL(CP) (1)12 AWE,G SOUTH RESERVOIR SCADA/CONTROL 16(2)14 AWE,C 1
<br /> PANEL"A" STORAGE ROOM (1)12 AWG,P 3/4 41 HATCH"A"SWITCH PANEL (2)14AWG,SP
<br /> 9 ROLL-UP DOOR (1)12 AWG,N (INTRUSION) (1)12 AWG,G
<br /> (1/2 HP) (1)12 AWG,G SOUTH RESERVOIR SCADA/CONTROL (2)14 AWG,C 1
<br /> PANEL"A" MINI-SPLIT SYSTEM (2)12 AWG,P 3/4 VERIFY IF NEUTRAL IS REQUIRED WITH 42 HATCH"B"SWITCH PANEL (2)14AWE,SP
<br /> 10 DISCONNECT (1)12 AWE.N MINI-SPLIT MANUF.DO NOT INSTALL IF (INTRUSION) (1(12 AWE,G
<br /> (2)14AWG,C
<br /> (1)12AWG,IS NOT REQUIRED. SOUTH RESERVOIR SCADA/CONTROLDA/CONTROL 1
<br /> PANEL"A" AIR HANDLER UNIT (2)30 AWG,P 3/4 VERIFY IF NEUTRALIS REQUIRED WITH 43 HIGH LEVEL FLOAT SW PANEL (2)14 AWG,SP
<br /> 11 (AHU) (1)10 AWG,N AHU MANUF.DO NOT INSTALL IF (1)12 AWG,G
<br /> (1)10 AWG,G NOT REQUIRED. SOUTH RESERVOIR SCADA/CONTROL (1)16 TSP,C 1
<br /> PANEL"A" HOIST/TROLLEY/ (2)10 AWG,P 3/4 VERIFY IF NEUTRAL 15 REQUIRED WITH 44 LEVEL SENSOR"A" PANEL (1)16 TSP,SP
<br /> 12 BRIDGE CRANE(KB)CP (1)10 AWG,N BRIDGE CRANE MANUF.DO NOT INSTALL (1)12 AWG,G
<br /> DISC.(3 X 1 HP) (1)10 AWG,G IF NOT REQUIRED. SOUTH RESERVOIR SCADA/CONTROL (1)16 TSP,C 1
<br /> PANEL"A" HEAT PUMP (2)12 AWG,P 3/4 VERIFY IF NEUTRAL IS REQUIRED WITH 45 LEVEL SENSOR"B" PANEL (1)16 TSP,SP
<br /> 13 DISCONNECT (1)I2AWE,N MINI-SPLIT MANUF.DO NOT INSTALL IF
<br /> (1)12 AWE,G
<br /> (1)12 AWG,G NOT REQUIRED. RESERVOIR POLE SCADA/CONTROL (1)FO CABLE 3 CAMERA IS POE POWERED AND HAS A
<br /> PANEL"A" FLOW METER VAULT (1)10 AWG,P 1 46 MOUNT CAMERA PANEL (1)IO AWG,G MEDIA CONVERTER AT THE POLE.
<br /> 14 DED RECEPT FOR (1)10 AWG,N • FO CABLE IS 6-STRAND.
<br /> SUMP PUMP(1/3 HP) (l)10 AWG,G POWER VAULT VALVE HOUSE 2 — 2 SPARE CONDUIT FOR"FUTURE"
<br /> SCADA/CONTROL POLE-MOUNTED (1)8 AWG,P 1 12OVAC UPS POWER FOR POLE-MOUNTED 47
<br /> 15 PANEL CAMERAS WITH MEDIA (1)B AWG,N CAMERAS WITH MEDIA CONVERTER.
<br /> CONVERTERS (i)6 AWG,G Cl2 ANALYZER SCADA/CONTROL (2)16 TSP,C 1 RUN(2)TSP'S TO EACH CL2 ANALYZER
<br /> PANEL"A" BACKFLOW VAULT (1)6 AWG,P 1 48 PANEL (2)16 TSP,SP
<br /> 16 BED RECEPT FOR (1)6 AWG,N (1)12 AWG,G
<br /> I
<br /> SUMP PUMP(1/3 HP) (l)6 AWG,G SMOKE DETECTOR 1 SCADA/CONTROL (2)14 AWG,P 3/4 (2)14 AWG,C FROM SMOKE DETECTOR 2
<br /> PANEL"A" RECEPTACLES IN (1)6 AWG,P 1 ALLSPLICES/TAPS TO BE LOCATED IN 49 PANEL (4)I4 AWG,C DAISEY-CHAIN POWER TO SMOKE
<br /> 17 EQUIPMENT VAULTS (1)6 AWG,N JUNCTION BOXES OR POWER VAULT (1)12 AWG,G DETECTOR 2
<br /> &RESERVOIR TOPS (i)6 AWG,G SMOKE DETECTOR 2 SMOKE DETECTOR 1 (2)14 AWG,P 3/4
<br /> PANEL"A" LIGHTS IN EQUIPMENT (1)10 AWG,P 1 ALL SPLICES/TAPS TO BE LOCATED IN 50 (2)14 AWG,C
<br /> 18 VAULTS (1)10 AWG,N JUNCTION BOXES OR POWER VAULT
<br /> (1)14 AWG,G
<br /> (1)10 AWG,G ROLL-UP DOOR SCADA/CONTROL
<br /> I
<br /> NOT USED
<br /> POWER VAULTS — — (2)14AWG,C 3/4
<br /> (2)2 SPARE CONDORS FOR"FUTURE". 51 INTRUSION(DOOR)SW PANEL (1)12 AWG,G
<br /> 2�2 19 PANEL,PANEL"A",OR PROVIDE PULL CORDS.
<br /> v 5 !-y. ���v.�-.�-. -.�i-.�� MAN-DOOR 1 SCADA/CONTROL (2)14 AWG,C 3/4
<br /> NOT USED 52 INTRUSION(DOOR)SW PANEL
<br /> r R 1 •20 ^ ^ (1)12 AWG,G
<br /> MAN-DOOR 2 SCADA/CONTROL (2)14 AWE,C 3/4
<br /> v` t-.r -(o.v. � vv..i.v 53 INTRUSION(DOOR)SW PANEL
<br /> d z 21 v ) (1)12 AWG,G
<br /> (1J 10AWG,Nv
<br /> 40V
<br /> (1)10 AWG,G SPLIT-SYSTEM SPUT-SYSTEM (2)12 AWG,P 3/4 VERIFY WIRING REQUIREMENTS WITH
<br /> 3 22 PANEL"A' SOA,WELDER RECEPT (2)6 AWG,P 1 COORDINATE RECEPT CONFIGURATION 54 OUTDOOR UNIT(HP-2) INDOOR UNIT(AR-2) (2f 12 AWG,[ SPLIT-SYSTEM MANUF./SUPPLIER
<br /> (1)6AWG,N WITH CRY.CAP NEUTRAL AND COIL IN (1)12AWG,G
<br /> n 2
<br /> PANEL"A" TANKLESS WATER (1)10 AWG,G RECEPT BOX IF NOT REM). AIR HANDLER 1(AH-1) -INTAKE LOUVER (I)12 AWG,P 3/4 VERIFY WIRING REQUIREMENTS WITH
<br /> 0 23 HEATER (2)8 AWG,P 3/4 55 MOTORIZED DAMPER (1)12AWG,N AIR HANDLER MANUF/SUPPLIER
<br /> ' (1)10 AWG,G (1)12 AWE,G
<br /> g STOARGE ROOM AIR HANDLER 1(AH-1) SEE NOTES 3/4 VERIFY WIRING REQUIREMENTS WITH
<br /> o PANEL"A" RESERVOIR 4 (1)10 AWE,P 1 56 T-STAY (1J 12 AWE,G AIR HANDLER MANUF/SUPPLIER
<br /> •R 24 VALVE ACTUATOR (1)10 AWG,N
<br /> //�� �-1.44/ 04.--.� �-��.-����� r�� STOARGE ROOM SPUT-SYSTEM SEE NOTES 3/4 VERIFY WIRING REQUIREMENTS WITH
<br /> `y a �( �^PANEL"A" ��� VALVE HOUSE — 2 PROVIDE DEDICATED CONDUIT W/PULL 57 T-STAT INDOOR UNIT(AH-2) (1)12 AWG,G AIR HANDLER MANUF/SUPPLIER
<br /> `j\ '25 CORD FROM PANEL"A"TO FIRST VAULT
<br /> „' &FROM LAST VAULT VALVE HOUSE. vv / SCADA/CONTROL CELLULAR ANTENNA COAX 2 VERIFY CABLE REQUIREMENTS FOR
<br /> 8�
<br /> o vim- jyp -y �v�Sa(D� vvvvvvvvvv �/ 58 PANEL
<br /> (S)10 AWG,G CELLULAR SYSTEM WITH CELL MODEM
<br /> 26 HATCH SWITCH PANEL 12)14 AWG,SP MANUF/SUPPLIER(INTRUSION) (1)12 AWG,G PANEL"A" DED RECEPT FOR (1)10 AWE,P 1 VERIFY SUMP PUMP LOCATION.
<br /> ?s: FLOW METER VAULT SCADA/CONTROL (2)14 AWG,C I 59 UNDERDRAIN (1)10 AWG,N
<br /> 3 c 3 27 FLOAT SWITCH(FLOOD) PANEL (2)14 AWG,SP
<br /> qq SUMP PUMP(1/3 HP) (S)IO AWG,G
<br /> W v FLOW METER ELEC SCADA/CONTROL (1)12 AWG,G
<br /> ° 28 FLOW RATE(ANALOG) PANEL 16I2) TSP,C 1 USE(1)16 TSP FOR PULSE TOTALIZER 60
<br /> q y (2)16 TSP,SP SIGNAL
<br /> &TOTALIZE(DIGITAL) (1)12 AWG,G
<br /> .J WIER MH 1 FLOW METER SCADA/CONTROL (2)SE TSP,C 1 USE(1)16 TSP FOR PULSE TOTALIZER -
<br /> fi•oa rr�� ges2Sy,,W„�yvard 29 FLOW RATE(ANALOG) PANEL (2)16TSP,SP SIGNAL
<br /> Y O � Bawe0r &TOTAUZE(DIGITAL) (1)12 AWG,G CIRCUIT SCHEDULE
<br /> m _ ` "�"'•'"•O""O"° ' WIER MR 2 FLOW METER SCADA/CONTROL ---
<br /> (2)i6 TSP,C 1 USE(1116 TSP FOR PULSE TOTALIZER
<br /> f f ENGINEERING,INC. F., (5031r34J0ZB 30 FLOW RATE(ANALOG) PANEL (2)16 TSP,SP SIGNAL SCALE: NTS
<br /> d'" 1 -F gi er i gGo-gnnd SaMiov" E-".r,o.NW.'".g o. &TOTALIZE(DIGITAL) (1)12 AWG,G
<br /> 3 R P,*aS.�a43.121.001 Cantos JEFFHOWMD
<br /> d R_
<br /> 5 5 9 Oeslgned JLH �(L././D Drawing
<br /> `; _ODrawn
<br /> leded HMS '" ` ', EVERETT
<br /> REPLACEMENT OF RESERVOIR 2 ELECTRICAL E13
<br /> o 3/5/2021 JLH PER ADDENDUM NO.S SW
<br /> Design �/ �.la
<br /> F ` PUBLIC WORKS
<br /> ▪4 NO. DATE APRVD REVISION Dadgn Review Level r/�,/' '' ° murraysmith L U M I N A I R E A N D CIRCUIT 123
<br /> r 9 PLANS ISSUED FOR Y131T1 3200CedorStreet
<br /> v X . AfG1BTE1 CT Everett,WA98201 WORK ORDER U P 3 6 5 8 123
<br /> >°c E BID CONST RECORD SS/ONAL0 ,S t+ 425.257.8800 everettwB.gov SCHEDULES 126
<br /> IL '^ ACTION DATE APRVD ACTION DATE APRVD _ACTION DATE APRVD 3