My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Walsh Construction Company II LLC 6/7/2021
>
Contracts
>
Capital Contract
>
Walsh Construction Company II LLC 6/7/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2023 3:53:32 PM
Creation date
6/10/2021 3:42:47 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Walsh Construction Company II LLC
Approval Date
6/7/2021
Council Approval Date
4/21/2021
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Replacement of Reservoir 2
Public Works WO Number
UP3658
Tracking Number
0002940
Total Compensation
$0.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Walsh Construction II, LLC 8/24/2023 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Walsh Construction II, LLC 8/7/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1466
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> $ <br /> I <br /> I 6"MIN I: TYP WELD, EXTERIOR <br /> /"t" AND INTERIOR <br /> FIELD APPLY PRIMER,MASTIC FILLERS 2/2"MIN - 6" MIN <br /> AND HEAT-SHRINK SLEEVE AFTER TYP <br /> I WELDING&AIR TESTING,SEE SPECS <br /> r4, I <br /> FACTORY APPLIED MORTAR 1/4"IPT TAP FOR AIR TEST,PLUG WELD AFTER <br /> LINING,SEE SPECS 1" I COMPLETION OF AIR TEST,SEE DET 8 ,SHT CD10 <br /> I FIELD APPLIED CEMENT MORTAR MIN <br /> LINING AFTER WELDING AND AIR MIN 6" MIN j <br /> TESTING,SEE SPECS MIN <br /> NOTES: <br /> I1. "t" = SAME THICKNESS AS PIPE WALL. <br /> 2. WELD SIZE"t" NOT TO EXCEED THICKNESS OF THINNER PART OF JOINT. <br /> I <br /> 3. ALL SURFACES SHALL BE CLEAN AND DRY PRIOR TO AND DURING THE <br /> JOINT COATING PROCESS. <br /> 4. HOLD-BACK LINING AND COATINGS 6" MINIMUM. <br /> II <br /> 10 STEEL PIPE LAP JOINT - DETAIL <br /> I <br /> 1 <br /> I <br /> I <br /> I <br /> ,,' <br /> I <br /> I <br /> g <br />
The URL can be used to link to this page
Your browser does not support the video tag.