My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Walsh Construction Company II LLC 6/7/2021
>
Contracts
>
Capital Contract
>
Walsh Construction Company II LLC 6/7/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2023 3:53:32 PM
Creation date
6/10/2021 3:42:47 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Walsh Construction Company II LLC
Approval Date
6/7/2021
Council Approval Date
4/21/2021
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Replacement of Reservoir 2
Public Works WO Number
UP3658
Tracking Number
0002940
Total Compensation
$0.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Walsh Construction II, LLC 8/24/2023 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Walsh Construction II, LLC 8/7/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1466
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bidder Comments Form <br /> Document Title: Replacement of Reservoir 2 Bidder Question Log Date: 3/18/2021 <br /> Item <br /> No. Dwg/Fig No. Reviewer's Comments Comment by Designer's Response <br /> Drawings,Specs,Report or Other Document(Refer to document below in Comments) <br /> ENTER SHEET <br /> NUMBER OR SPEC <br /> NUMBER BIDDER COMMENTS COMPANY RESPONSE <br /> Drawing D180(Sheet 16):For the Western work location on Charles Ave,Note 11 shows saw <br /> 12 cutting and asphalt removal but we can't find any pipe capping or abandonment work specified JW Fowler <br /> to occur at this location.Please review and resolve. See Addendum No 7.Some of the asphalt removal is for a new sewer connection. <br /> M 1111111 IIIII 1.11 PIE; q4 eig, MI <br />
The URL can be used to link to this page
Your browser does not support the video tag.