Laserfiche WebLink
I <br /> 2. Bidder's Project Superintendent: Within p the 10 years prior to Bid opening, the <br /> Bidder's Project Superintendent for the Project must have completed at least one <br /> project, as the project manager or project superintendent, that each included <br /> construction of water storage tanks with a volume of at least 750,000 gallons. <br /> List the Project Superintendent's name and projects that show that he or she has this I <br /> experience. <br /> Name: <br /> Note: The Bidder's project-manager and project superintendent cannot be the same <br /> individual. I <br /> PROJECT NAME YEAR OWNER LOCATION AND SIZE <br /> I <br /> I <br /> Furnish references for information concerning all work listed above 3 <br /> NAME TITLE PHONE NUMBER EMAIL ADDRESS <br /> I <br /> I <br /> r� <br /> I <br /> I <br /> 1 <br /> Replacement of Reservoir 2 Bidder Qualification Statement <br /> WO# U P3658 00 45 13 -4 111 <br />