Laserfiche WebLink
I <br /> 3. Tank Co <br /> ntractor: Within 10 years prior to Bid opening the Tank Contractor must have <br /> completed at least two projects that each included construction of poured-in-place <br /> corewall, externally strandwrapped (not single wire wrapped) prestressed concrete <br /> water storage tanks with a volume of at least 1.0 million gallons. <br /> List the Tank Contractor's projects that show this experience. <br /> 1 PROJECT NAME AND SIZE YEAR OWNER LOCATION CONTRACT <br /> AMOUNT <br /> I <br /> I <br /> I <br /> I <br /> Furnish references for information concerning all work listed above <br /> 1 NAME TITLE PHONE NUMBER EMAIL ADDRESS <br /> I <br /> I <br /> I <br /> I <br /> I <br /> Replacement of Reservoir 2 Bidder Qualification Statement <br /> WO# UP3658 00 45 13 - 5 <br />