My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Walsh Construction Company II LLC 6/7/2021
>
Contracts
>
Capital Contract
>
Walsh Construction Company II LLC 6/7/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2023 3:53:32 PM
Creation date
6/10/2021 3:42:47 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Walsh Construction Company II LLC
Approval Date
6/7/2021
Council Approval Date
4/21/2021
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Replacement of Reservoir 2
Public Works WO Number
UP3658
Tracking Number
0002940
Total Compensation
$0.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Walsh Construction II, LLC 8/24/2023 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Walsh Construction II, LLC 8/7/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1466
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
omission, related work performed by the Contractor shall be done at its risk unless <br /> authorized by the Owner's Representative and approved by the Owner. Omissions <br /> from the Drawings or Specifications or the misdescription of details of Work that are <br /> manifestly necessary to carry out the intent of the Drawings and Specifications, or that <br /> are customarily performed, shall not relieve the Contractor from performing such <br /> omitted or misdescribed details of the Work, but they shall be performed as if fully <br /> and correctly set forth and described in the Drawings and Specifications. <br /> B. Conflicting Provisions <br /> 1. Figure dimensions on drawings shall govern over scale dimensions and detail drawings <br /> shall govern over general drawings. In the event an item of Work is described <br /> differently in two or more locations on the Drawings and in the Specifications, the <br /> Contractor shall, upon request of the Owner's Representative, submit in writing to the <br /> Owner's Representative the description upon which the Contractor relied in preparing <br /> its Bid or laying out the Work. If the Owner's Representative directs the Contractor to <br /> perform Work in a manner other than that contemplated by the Contractor in <br /> preparing its Bid or laying out the Work, Change Order procedures will be followed. <br /> In this event, the Contractor shall submit to the Owner's Representative such <br /> supporting information, including bidding or layout documents, as may reasonably be <br /> necessary for the Owner's Representative to determine whether the Contract Sum is <br /> increased, decreased or unchanged by the Change Order. <br /> C. Utilities <br /> 1. General <br /> a. The Owner has endeavored to determine the existence of utilities at the Site of <br /> the Work from the records of the owners of known utilities in the vicinity of the <br /> Work. The positions of these utilities as derived from such records are shown on <br /> the Drawings. No excavations were made to verify the locations shown for <br /> underground utilities. The service connections to these utilities are not shown on <br /> the Drawings. It shall be the responsibility of the Contractor to determine the <br /> exact location of utilities and service connections thereto. Such field verification <br /> must be performed in sufficient time so as not to impede the progress of the Work <br /> or fabrication of materials to be incorporated into the Work. The Contractor shall <br /> call the Utility Location Request Center (one call center) for location of utilities in <br /> the field not less than two (2) nor more than (10) ten business days before the <br /> scheduled date of commencement of excavation. The Contractor shall make its <br /> own investigations, including exploratory excavations, to determine the locations <br /> and type of existing utilities, including service connections, prior to commencing <br /> work that could result in damage to such utilities. The Contractor shall <br /> immediately notify the Owner's Representative as to any utility discovered by him <br /> in a different position than shown on the Drawings or which is not shown on the <br /> Drawings. No excavation shall begin until all known facilities in the excavation <br /> areas have been marked. Contractor shall coordinate its activities with the utility <br /> provider. Contractor shall bear the cost of maintaining utility service. <br /> Replacement of Reservoir 2 General Conditions <br /> WO# UP3658 00 72 13 - 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.