My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Walsh Construction Company II LLC 6/7/2021
>
Contracts
>
Capital Contract
>
Walsh Construction Company II LLC 6/7/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2023 3:53:32 PM
Creation date
6/10/2021 3:42:47 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Walsh Construction Company II LLC
Approval Date
6/7/2021
Council Approval Date
4/21/2021
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Replacement of Reservoir 2
Public Works WO Number
UP3658
Tracking Number
0002940
Total Compensation
$0.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Walsh Construction II, LLC 8/24/2023 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Walsh Construction II, LLC 8/7/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1466
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00 60 13, CONTRACT <br /> 1. Replace entire SECTION 00 60 13, CONTRACT with attached new SECTION 00 60 13, <br /> CONTRACT. <br /> SECTION 00 72 13, GENERAL CONDITIONS <br /> 2. Replace entire SECTION 00 72 13, GENERAL CONDITIONS with attached new SECTION <br /> 00 72 13, GENERAL CONDITIONS. <br /> SECTION 01 22 00, MEASUREMENT AND PAYMENT <br /> 1. Part 1.2, 3 "Trench and Excavation Safety Systems", replace the second paragraph with <br /> the following, "The lump sum bid shall constitute full compensation for all material, labor <br /> and equipment, complete and in place, for work necessary to protect all excavations. The <br /> installation of shoring and trench safety systems includes, but is not limited to, shoring, <br /> benching, bracing, excavating, sheeting and trench boxes, and contractor designed <br /> excavation support systems, as required by these Contract Documents and pertinent laws <br /> and regulations." <br /> VOLUME 3, DRAWINGS <br /> SHEET 105, DRAWING M7 "RESERVOIR INLET MIXING SYSTEM DETAILS" <br /> 1. Note 3, delete note in its entirety and replace with "ALL FASTENERS, FOR HDPE PIPE AND <br /> FITTINGS SHALL BE STAINLESS STEEL. STAINLESS STEEL BACKING RINGS SHALL BE <br /> USED IN FLANGED ASSEMBLIES." <br /> All other requirements of the contract documents remain in effect. <br /> City of Everett <br /> �, 1•L•N .fir <br /> 0:1•'of wary/4c ``v.a <br /> ;s <br /> ,c ‘z3 O3 <br /> sIONALE.... <br /> Souheil Nasr, P.E. <br /> Project Manager <br /> Addendum 1 Page 2 <br /> CITY OF EVERETT • 3200 Cedar Street • Everett, WA 98201 • (425) 257-8800 • Fax (425) 257-8882 <br />
The URL can be used to link to this page
Your browser does not support the video tag.