Laserfiche WebLink
SECTION 00 60 13, CONTRACT <br /> 1. Replace entire SECTION 00 60 13, CONTRACT with attached new SECTION 00 60 13, <br /> CONTRACT. <br /> SECTION 00 72 13, GENERAL CONDITIONS <br /> 2. Replace entire SECTION 00 72 13, GENERAL CONDITIONS with attached new SECTION <br /> 00 72 13, GENERAL CONDITIONS. <br /> SECTION 01 22 00, MEASUREMENT AND PAYMENT <br /> 1. Part 1.2, 3 "Trench and Excavation Safety Systems", replace the second paragraph with <br /> the following, "The lump sum bid shall constitute full compensation for all material, labor <br /> and equipment, complete and in place, for work necessary to protect all excavations. The <br /> installation of shoring and trench safety systems includes, but is not limited to, shoring, <br /> benching, bracing, excavating, sheeting and trench boxes, and contractor designed <br /> excavation support systems, as required by these Contract Documents and pertinent laws <br /> and regulations." <br /> VOLUME 3, DRAWINGS <br /> SHEET 105, DRAWING M7 "RESERVOIR INLET MIXING SYSTEM DETAILS" <br /> 1. Note 3, delete note in its entirety and replace with "ALL FASTENERS, FOR HDPE PIPE AND <br /> FITTINGS SHALL BE STAINLESS STEEL. STAINLESS STEEL BACKING RINGS SHALL BE <br /> USED IN FLANGED ASSEMBLIES." <br /> All other requirements of the contract documents remain in effect. <br /> City of Everett <br /> �, 1•L•N .fir <br /> 0:1•'of wary/4c ``v.a <br /> ;s <br /> ,c ‘z3 O3 <br /> sIONALE.... <br /> Souheil Nasr, P.E. <br /> Project Manager <br /> Addendum 1 Page 2 <br /> CITY OF EVERETT • 3200 Cedar Street • Everett, WA 98201 • (425) 257-8800 • Fax (425) 257-8882 <br />