Laserfiche WebLink
SECTION 00 60 13 <br /> CONTRACT <br /> 1.1 GENERAL • <br /> A. THIS CONTRACT is made and entered into this a day of Apt__ , 2021 by <br /> and between the City of Everett, Washington, a municipal corporation existing under the <br /> laws of the State of Washington, hereinafter called the "City," and <br /> W PAS U CONS1"AvG1-t00 LJMPAN--%`\ 11) a <br /> ti l-1�01 S CoRPo \�r., , hereinafter called the "Contractor." <br /> B. In consideration of the sums to be paid to it by the City, Contractor hereby covenants and <br /> agrees to furnish all labor,tools, materials, equipment, and supplies required to build and <br /> construct and to build and construct in a workmanlike manner the Work, improvements, <br /> and appurtenances in accordance with the Specifications and Drawings entitled: <br /> "REPLACEMENT OF RESERVOIR 2". <br /> 1.2 DEFINITIONS <br /> A. Contract Documents. "Contract Documents" is defined in DOCUMENT 00 72 13 - <br /> GENERAL CONDITIONS. <br /> B. Terms that are capitalized in a Contract Document but not defined in that Contract <br /> Document shall have the meaning defined to them in the other Contract Documents. <br /> 2. Contract Time. <br /> A. Substantial Completion of the Work shall be achieved within 360 working days after <br /> the effective date of the Notice to Proceed. <br /> B. Physical Completion shall be within 70 working days after the actual date of <br /> issuance of substantial completion. <br /> 3. Liquidated Damages. <br /> A. The parties agree the City will suffer damage and be put to additional expense in <br /> the event that the Contractor does not complete the Work in all respects and have <br /> it ready for use by the Substantial and Physical Completion dates stated above and <br /> as adjusted for weather related delays. <br /> B. Because it is difficult to accurately compute the amount of such costs and damages, <br /> the Contractor hereby covenants and agrees to pay to the City liquidated damages <br /> for each and every calendar day (or working day, if Contract Time is described in <br /> working days) in the amounts set forth in this Section. <br /> Replacement of Reservoir 2 Contract <br /> WO# UP3658 00 60 13 - 1 <br />