5.5 Possession and Use of Completed Portions of the Work <br /> A. The Owner shall have the right to take possession of and use completed or partially <br /> completed portions of the Work even though the time for completing the Work for such <br /> portions may not have expired. Operations and maintenance costs of use of such Work <br /> will be borne by the Owner. Such possession and use shall not be deemed as acceptance <br /> of the Work. If such prior possession or use increases the cost of the Work,the Contractor <br /> may be entitled to request extra compensation by giving Notice and following the <br /> procedures of ARTICLE 10 NOTICE TO OWNER and ARTICLE 12 CONTRACT CLAIMS within <br /> five (5) days of each occurrence. The Contractor shall not submit a Contract Claim for <br /> possession by the Owner of portions of the Work specifically required in the Contract <br /> Documents to be placed into use or operation before completion of the entirety of the <br /> Work. <br /> 5.6 Possession of Incomplete Portions of the Project <br /> A. Should the Contractor fail to meet any date specified for Substantial Completion of Work <br /> or any portion of work requiring early possession and use by the Owner, the Owner may, <br /> after a 10-day notice to the Contractor, take over such portion or any Work that is behind <br /> schedule. In such case, the Owner's Representative will prepare a list of incomplete Work <br /> taken over by the Owner. The cost of Owner's work will be charged to and deducted from <br /> amounts due to the Contractor. The Substantial Completion date of the entire or a portion <br /> of the Project will be established as the date when the Owner actually begins using the <br /> Project or portion of the Project for its intended purpose. Division of responsibilities <br /> between Owner and Contractor, beginning of warranties, and any other issues relating to <br /> Substantial Completion shall be as specified in 5.7. Substantial Completion. <br /> 5.7 Substantial Completion <br /> A. When the Contractor considers the Work to be Substantially Complete and ready for its <br /> intended use, it shall give Notice to the Owner's Representative. The Notice shall include <br /> an itemized list of remaining incomplete Work. If the Owner's Representative determine <br /> the Work is not substantially complete, the Contractor will be notified in writing, <br /> identifying the reasons for such a determination. <br /> 1. If the Owner's Representatives find the Work substantially complete, he or she will <br /> meet with the Contractor to: <br /> a. Prepare a Punch List of incomplete items of Work. <br /> b. Define the division of responsibility between Owner and Contractor with respect <br /> to security, operation, maintenance, heat, utilities, insurance, and warranties. <br /> c. Describe any other issues related to acceptance of the substantially completed <br /> Work. <br /> B. If the Owner's Representative is not an employee of the Owner, the Owner's <br /> Representative will write to the Owner upon reaching agreement with the Contractor, <br /> certifying that the Work is substantially complete, listing the items of incomplete Work, <br /> stating the date for completion of incomplete Work, defining the division of <br /> responsibilities, and setting forth any other terms related to acceptance. In such event, <br /> Replacement of Reservoir 2 General Conditions <br /> WO# UP3658 00 72 13 - 32 <br />