My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Walsh Construction Company II LLC 6/7/2021
>
Contracts
>
Capital Contract
>
Walsh Construction Company II LLC 6/7/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2023 3:53:32 PM
Creation date
6/10/2021 3:42:47 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Walsh Construction Company II LLC
Approval Date
6/7/2021
Council Approval Date
4/21/2021
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Replacement of Reservoir 2
Public Works WO Number
UP3658
Tracking Number
0002940
Total Compensation
$0.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Walsh Construction II, LLC 8/24/2023 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Walsh Construction II, LLC 8/7/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1466
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work in excess of the standard work week is permissible, provided the worker is <br /> compensated as required by law. <br /> 7.5 Overtime Work <br /> A. Overtime and shift work may be established as a regular procedure by the Contractor with <br /> reasonable Notice to and written permission of the Owner's Representative. Permission <br /> may be denied for such reasons as noise, traffic, or other interference with the <br /> neighborhood in which the Project is located, or the lack of availability of inspectors during <br /> overtime or shift work. <br /> 7.6 Labor Relations <br /> A. The Contractor shall take all reasonable steps to prevent any labor Disputes involving the <br /> Contractor and any of its Subcontractors or Suppliers of any products or services from <br /> disrupting the Work under this Contract or interfering with access to the Owner's property <br /> by the Owner, including its agents, representatives, employees and officials, any other <br /> contractors engaged in construction activities, or members of the public. <br /> B. In the event any picketing or other concerted activity by employees involved in a labor <br /> Dispute with the Contractor or its Subcontractors or Suppliers interferes in any way with <br /> access to the Owner's property by any persons, the Contractor shall promptly and <br /> expeditiously take all reasonable actions to eliminate or minimize such interference, <br /> including but not limited to: <br /> 1. Utilizing all reasonable means of restricting any picketing to a single entrance to the <br /> Owner's property; <br /> 2. Posting notices or signs which advise interested persons and labor organizations that a <br /> particular entrance to the Owner's property is for the employees of "primary" or, as <br /> the case may be, "neutral" employers; <br /> 3. Policing entrances to ensure that only authorized personnel may use those entrances; <br /> 4. Notifying all interested labor organizations of the "primary" or "neutral" status of <br /> particular entrances; and <br /> 5. In the event any such picketing or concerted activity is unlawful or has a secondary <br /> impact upon the employees of neutral employers, promptly and expeditiously taking <br /> appropriate action to seek recourse through the appropriate governmental agency or <br /> state or federal courts to limit the location of such picketing so as to reduce the impact <br /> thereof upon neutral employers. <br /> C. The Owner will cooperate with the Contractor to accomplish the foregoing actions and will <br /> render assistance as may be in the best interests of the Owner. However, the Owner shall <br /> have the right to direct the Contractor to modify any of the foregoing actions the <br /> Contractor has taken or plans to take or to overrule such actions, to designate the <br /> entrances to be used as "primary" or "neutral" entrances, and to take appropriate legal <br /> action in order to protect the Owner's property and interests. In any event,the Contractor <br /> shall be liable for all Delays and costs, including costs to the Owner, and actual damages <br /> Replacement of Reservoir 2 General Conditions <br /> WO# UP3658 00 72 13 - 38 <br />
The URL can be used to link to this page
Your browser does not support the video tag.