My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Walsh Construction Company II LLC 6/7/2021
>
Contracts
>
Capital Contract
>
Walsh Construction Company II LLC 6/7/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2023 3:53:32 PM
Creation date
6/10/2021 3:42:47 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Walsh Construction Company II LLC
Approval Date
6/7/2021
Council Approval Date
4/21/2021
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Replacement of Reservoir 2
Public Works WO Number
UP3658
Tracking Number
0002940
Total Compensation
$0.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Walsh Construction II, LLC 8/24/2023 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Walsh Construction II, LLC 8/7/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1466
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
resulting from the relocation, rerouting, Delays or actions required to maintain the <br /> uninterrupted progress of the Work. Failure by the Contractor to take the actions <br /> described above or to comply with the directives of the Owner shall be considered a breach <br /> of this Contract and the Owner may terminate the Contract or suspend the Contractor as <br /> provided in this Contract. <br /> ARTICLE 8 MATERIAL, EQUIPMENT, WORKMANSHIP AND CONSTRUCTION UTILITIES <br /> 8.1 General <br /> A. Unless otherwise specifically stated in the Contract Documents, the Contractor shall <br /> provide and pay for materials, labor,tools, Equipment, water, light, power, transportation, <br /> supervision, and temporary construction of any nature, and other services and facilities of <br /> any nature, whatsoever necessary, to execute, complete and deliver the Work within the <br /> specified time. Contractor shall be liable for all power and water costs until Substantial <br /> Completion, whether such power or water is provided by temporary or permanent <br /> facilities. Owner shall not be liable for any costs or Delays arising out of or caused by the <br /> availability or lack of availability of permanent power or utilities. Material and Equipment <br /> shall be new and of the specified quality. Equipment offered shall be new or current <br /> specified models. This requirement does not apply to minor details, or to thoroughly <br /> demonstrated improvements in design or in materials of construction. Construction Work <br /> shall be executed in conformity with the standard practice of the trade. <br /> 8.2 Product Data <br /> A. When specified, the Contractor shall provide data required for inspecting, testing, <br /> operating, or maintaining parts of the Work. Unless otherwise specified, such data shall <br /> be provided at the time the referenced material or Equipment is delivered to the job Site. <br /> The data shall be as specified and shall include, unless otherwise specified, such items as <br /> shop drawings, erection drawings, reinforcing steel schedules, testing and adjusting <br /> instructions, operations manuals, maintenance procedures, parts lists, and record <br /> drawings. Such data shall be provided as part of the Work under this Contract and its <br /> acceptability determined by the Owner in its sole discretion. <br /> 8.3 Quality <br /> A. Where detailed Specifications of materials, Equipment, or construction Work are not set <br /> forth, the Contractor shall perform the Work using materials and Equipment of a quality <br /> comparable to the materials and workmanship specified for the other parts of the Work, <br /> from firms of established good reputations, and shall follow standard practices to perform <br /> construction Work of good quality in a workmanlike way. Work performed shall be in <br /> conformity and harmony with the intent to secure the standard of construction and <br /> Equipment of Work as a whole and in part. All Work must comply and conform to <br /> applicable building codes in effect when the Work is performed. <br /> Replacement of Reservoir 2 General Conditions <br /> WO# UP3658 00 72 13 - 39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.