Laserfiche WebLink
resulting from the relocation, rerouting, Delays or actions required to maintain the <br /> uninterrupted progress of the Work. Failure by the Contractor to take the actions <br /> described above or to comply with the directives of the Owner shall be considered a breach <br /> of this Contract and the Owner may terminate the Contract or suspend the Contractor as <br /> provided in this Contract. <br /> ARTICLE 8 MATERIAL, EQUIPMENT, WORKMANSHIP AND CONSTRUCTION UTILITIES <br /> 8.1 General <br /> A. Unless otherwise specifically stated in the Contract Documents, the Contractor shall <br /> provide and pay for materials, labor,tools, Equipment, water, light, power, transportation, <br /> supervision, and temporary construction of any nature, and other services and facilities of <br /> any nature, whatsoever necessary, to execute, complete and deliver the Work within the <br /> specified time. Contractor shall be liable for all power and water costs until Substantial <br /> Completion, whether such power or water is provided by temporary or permanent <br /> facilities. Owner shall not be liable for any costs or Delays arising out of or caused by the <br /> availability or lack of availability of permanent power or utilities. Material and Equipment <br /> shall be new and of the specified quality. Equipment offered shall be new or current <br /> specified models. This requirement does not apply to minor details, or to thoroughly <br /> demonstrated improvements in design or in materials of construction. Construction Work <br /> shall be executed in conformity with the standard practice of the trade. <br /> 8.2 Product Data <br /> A. When specified, the Contractor shall provide data required for inspecting, testing, <br /> operating, or maintaining parts of the Work. Unless otherwise specified, such data shall <br /> be provided at the time the referenced material or Equipment is delivered to the job Site. <br /> The data shall be as specified and shall include, unless otherwise specified, such items as <br /> shop drawings, erection drawings, reinforcing steel schedules, testing and adjusting <br /> instructions, operations manuals, maintenance procedures, parts lists, and record <br /> drawings. Such data shall be provided as part of the Work under this Contract and its <br /> acceptability determined by the Owner in its sole discretion. <br /> 8.3 Quality <br /> A. Where detailed Specifications of materials, Equipment, or construction Work are not set <br /> forth, the Contractor shall perform the Work using materials and Equipment of a quality <br /> comparable to the materials and workmanship specified for the other parts of the Work, <br /> from firms of established good reputations, and shall follow standard practices to perform <br /> construction Work of good quality in a workmanlike way. Work performed shall be in <br /> conformity and harmony with the intent to secure the standard of construction and <br /> Equipment of Work as a whole and in part. All Work must comply and conform to <br /> applicable building codes in effect when the Work is performed. <br /> Replacement of Reservoir 2 General Conditions <br /> WO# UP3658 00 72 13 - 39 <br />