My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Walsh Construction Company II LLC 6/7/2021
>
Contracts
>
Capital Contract
>
Walsh Construction Company II LLC 6/7/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2023 3:53:32 PM
Creation date
6/10/2021 3:42:47 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Walsh Construction Company II LLC
Approval Date
6/7/2021
Council Approval Date
4/21/2021
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Replacement of Reservoir 2
Public Works WO Number
UP3658
Tracking Number
0002940
Total Compensation
$0.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Walsh Construction II, LLC 8/24/2023 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Walsh Construction II, LLC 8/7/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1466
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8.4 Material and Equipment Specified by Name <br /> A. When material or Equipment is specified by reference to patents, brand names, or catalog <br /> numbers, the Owner will not usually consider or approve a substitution. However, the <br /> Contractor may offer substitutions of products it considers to be equal to that specified, <br /> but the Owner is not obliged or required to consider or accept such offered substitution. <br /> 8.5 Requests for Substitution <br /> A. The Contractor may offer material or Equipment of equal or better quality and <br /> performance in substitution for those specified. Only the Contractor may request <br /> substitutions. The Contractor's offers of substitution shall be made in writing to the <br /> Owner's Representative and shall include sufficient data to enable the Owner's <br /> Representative to assess the acceptability of the material or Equipment for the particular <br /> application and requirements. The Owner and Owner's Representative are not required <br /> or obligated to consider or review a request for substitution and may, in their sole <br /> discretion and option, consider or review such requests. <br /> B. If the offered substitution requires changes to or coordination with other portions of the <br /> work, the Contractor shall include with its substitution request any such drawings and <br /> details showing such changes. The Contractor agrees to perform these changes as part of <br /> the substitution of material or Equipment at no additional cost to the Owner. Approval of <br /> a substitution request shall not relieve the Contractor from responsibility for the efficiency, <br /> quality, and performance of the substitute material or Equipment, in the same manner and <br /> degree as the material and Equipment originally specified. Any cost differential associated <br /> with a substitution shall be reflected in the offer. If the Owner approves the substitution, <br /> the Contract Documents shall be modified by a Change Order modifying the Contract Sum <br /> in the amount of the cost differential. <br /> 8.6 Demonstration of Compliance with Contract Requirements <br /> A. Inspection <br /> 1. The burden of proving the constructed Work complies with the Contract Documents <br /> shall be on the Contractor at all times. To demonstrate its compliance with the <br /> Contract requirements, the Contractor shall assist the Owner's Representative in his <br /> or her inspection and observation of the Work. The Contractor shall grant the Owner's <br /> Representative access to the Work and Work Site, and to places where Work is being <br /> prepared, or where materials, Equipment, or machinery are being obtained for Work. <br /> The Contractor shall provide information requested by the Owner's Representative in <br /> connection with inspection work. <br /> 2. If the Contract Documents, laws, ordinances, or any public regulatory authority <br /> requires parts of the Work to be specially inspected, tested, or approved, the <br /> Contractor shall give the Owner's Representative adequate prior written Notice of the <br /> availability of the subject Work for examination, which Notice shall be not less than <br /> two (2) working days. <br /> Replacement of Reservoir 2 General Conditions <br /> WO# UP3658 00 72 13 - 40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.