Walsh Construction Company II LLC 6/7/2021
>
Contracts
>
Capital Contract
>
Walsh Construction Company II LLC 6/7/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2023 3:53:32 PM
Creation date
6/10/2021 3:42:47 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Walsh Construction Company II LLC
Approval Date
6/7/2021
Council Approval Date
4/21/2021
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Replacement of Reservoir 2
Public Works WO Number
UP3658
Tracking Number
0002940
Total Compensation
$0.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Walsh Construction II, LLC 8/24/2023 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Walsh Construction II, LLC 8/7/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1466
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
charges of engineers, architects, attorneys, and other professionals and all court or <br /> arbitration or other dispute resolution costs) arising out of or relating to such correction <br /> or repair or such removal and replacement (including but not limited to all costs of repair <br /> or replacement of Work of others) will be paid by Contractor. <br /> C. The Owner is hereby authorized to make such repairs if, ten (10) days after giving of such <br /> notice to the Contractor, the Contractor has failed to make or undertake the repairs with <br /> due diligence. In case of an emergency where, in the opinion of the Owner, Delay could <br /> cause serious loss or damage, repairs may be made prior to or concurrent with notice being <br /> sent to the Contractor. All expenses in connection with such repairs will be charged to the <br /> Contractor. <br /> D. In special circumstances where a particular item of Equipment is placed in continuous <br /> service before Substantial Completion of all the Work, the correction period for that item <br /> may start to run from an earlier date if so provided in the Specifications. <br /> E. Where defective Work (and damage to other Work resulting there from) has been <br /> corrected or removed and replaced under this Paragraph 8.10, the correction period <br /> hereunder with respect to such Work will be extended for an additional period of one year <br /> after such correction or removal and replacement has been satisfactorily completed. <br /> F. Contractor's obligations under this Paragraph 8.10 are in addition to any other obligation, <br /> guarantee or warranty. The provisions of this Paragraph 8.10 shall not be construed as a <br /> substitute for or a waiver of the provisions of any applicable statute of limitation or repose. <br /> ARTICLE 9 MEASUREMENT AND PAYMENT <br /> 9.1 Payments to Contractor <br /> A. Schedule of Values <br /> 1. The Contractor shall submit a Schedule of Values at least fifteen (15) days prior to <br /> submitting its first Application for Payment. If the Project contains Unit Price Work, in <br /> whole or in part, then the Schedule of Values for that portion of the Work shall also <br /> be based on unit prices. If the Bid form calls for a lump sum price, in whole or in part, <br /> then the Schedule of Values shall: reasonably allocate the Contract Sum among the <br /> various portions of the Work; be complete; be organized to include detailed <br /> breakdown of each major unit of the Work; be organized to correspond to <br /> Contractor's schedule; break down the Contract Sum showing the value assigned to <br /> each part of the Work; include an allowance for profit and Overhead; include Unit <br /> Price Work, if and to the extent indicated on the Bid form; be so organized as to <br /> ti facilitate assessment of work and payment of Subcontractors; and be balanced. To <br /> the greatest extent possible, the breakdown shall use the same tasks or units as the <br /> Contractor's schedule. Contractor shall provide documentation substantiating the <br /> cost allocation if asked by the Owner's Representative. Upon acceptance of the <br /> Schedule of Values by the Owner's Representative, it shall be used as a basis for all <br /> requests for payment. <br /> B. Progress Payments <br /> Replacement of Reservoir 2 General Conditions <br /> WO# UP3658 00 72 13 -45 <br />