My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Walsh Construction Company II LLC 6/7/2021
>
Contracts
>
Capital Contract
>
Walsh Construction Company II LLC 6/7/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2023 3:53:32 PM
Creation date
6/10/2021 3:42:47 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Walsh Construction Company II LLC
Approval Date
6/7/2021
Council Approval Date
4/21/2021
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Replacement of Reservoir 2
Public Works WO Number
UP3658
Tracking Number
0002940
Total Compensation
$0.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Walsh Construction II, LLC 8/24/2023 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Walsh Construction II, LLC 8/7/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1466
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
and accurate records for materials and where such records do not <br /> contemporaneously segregate and allocate by time, location and work the time <br /> and costs for each item or element of such work. Contractor's failure to keep and <br /> maintain such records constitutes a waiver of any Contract Claim or request by <br /> the Contractor for adjustment of Contract Sum for such costs or event. <br /> c. To the extent the Contractor is entitled to an adjustment of Contract Sum due to <br /> any Delay or extension of Contract Time, Contractor shall be compensated as <br /> provided in 12.4 Remedies. Such compensation shall be full, adequate and <br /> complete compensation for all direct, indirect, cumulative, inefficiency, impact <br /> and ripple costs causing, arising out of, or relating to such delays or extension. <br /> d. Contractor and Owner agree that compensation to the Contractor for a Contract <br /> Claim shall not exceed the Contractor's actual costs based upon Force Account as <br /> described in 9.6. Force Account. Contractor waives, releases, and agrees not to <br /> submit any request for adjustment of Contract Sum or Contract Claim based upon <br /> a "total cost" or "modified total cost" calculation, in whole or in part, but instead <br /> agrees that any and all requests for compensation shall be based upon accurate, <br /> complete and contemporaneous cost records that segregate and allocate actual <br /> costs (1) between base Contract Work and the work for which additional <br /> compensation is sought and (2) between each item of work for which additional <br /> compensation is sought. Claims for inefficiency shall only be based on and <br /> calculated by a comparison of productivity of similar Work performed in an <br /> unaffected or least affected area of the Project. <br /> 2. No claim for consequential damages of any kind will be allowed. <br /> 9.6 Unabsorbed and Extended Overhead <br /> A. Any Extended or Unabsorbed Overhead to which the Contractor may be entitled shall be <br /> calculated using the Eichleay formula by: <br /> 1. Determining the pro-rata amount of Overhead allocable to the subject project. This is <br /> accomplished by multiplying Overhead costs by the ratio of the subject project's <br /> billings to the Contractor's overall billings during the overall period of the subject <br /> Project's performance. The result is "Allocable Overhead." <br /> a. Any additional and unresolved direct cost claims presented by the Contractor <br /> concurrently with any request for Extended and/or Unabsorbed Overhead shall <br /> not be included in determining the ratio of the subject Project billings to overall <br /> Contractor billings for the period of project performance. <br /> 2. Determining the daily amount of Allocable Overhead for the subject Project. This is <br /> accomplished by dividing the Allocable Overhead for the subject Project by the <br /> number of days (as contractually defined) of Contract performance. The result is the <br /> Daily Rate of Allocable Overhead. <br /> 3. Determining the gross amount of potential additional compensation for Home Office <br /> Overhead due to the project extension. This is accomplished by multiplying the Daily <br /> Rate of Allocable Overhead by the number of days of project extension caused solely <br /> Replacement of Reservoir 2 General Conditions <br /> WO# UP3658 00 72 13 - 53 <br />
The URL can be used to link to this page
Your browser does not support the video tag.