Laserfiche WebLink
by the Owner. This results in the Gross Amount of Additional Home Office Overhead <br /> Compensation. <br /> 4. Adjusting the Gross Amount of Additional Home Office Overhead Compensation for <br /> any additional contribution for Overhead received by the Contractor on any Change <br /> Orders that are being presented and resolved concurrently with the subject <br /> calculation for Unabsorbed and/or Extended Home Office Overhead. The necessary <br /> adjustment would be to reduce the Gross Amount of Additional Home Office <br /> Overhead Compensation by any additional compensation for Overhead included in <br /> any direct cost claims being resolved concurrently with any claim for Extended and/or <br /> Unabsorbed Home Office Overhead. <br /> B. Contractor shall not receive compensation for cost of use of equity capital. <br /> 9.7 Force Account <br /> A. If Work or materials are to be paid for by Force Account, payment amounts will be <br /> determined and Contractor shall contemporaneously prepare, keep and maintain records <br /> segregated and allocated by time, location and item of Work in compliance with this <br /> subsection. Such records must be contemporaneously countersigned by the Owner or the <br /> Owner's Representative (or its designee). Any records not countersigned by the Owner or <br /> Owner's Representative shall be excluded from the calculation of payment under this <br /> subsection. <br /> B. The payments provided for herein shall be full payment for all Work done on a Force <br /> Account basis. The payment shall be deemed to cover all expenses of every nature, kind, <br /> and description, including all Overhead expenses, profit, occupational tax and any other <br /> Federal or State revenue acts, premiums on public liability and property damage insurance <br /> policies, and for the use of small tools and equipment for which no rental is allowed. Force <br /> Account is determined by Section 9.8 through 9.13 below. <br /> C. No Contract Claim for Force Account shall be allowed except upon written order by the <br /> Owner's Representative for Extra Work prior to the performance of the Extra Work. No <br /> Extra Work shall be construed as Force Account Work that can be measured under the <br /> Specifications and paid for at the unit prices or lump sum named in the Contract. <br /> D. The Owner's Representative shall compute the amount and costs of any Work to be paid <br /> by Force Account, and the amount certified by the Owner's Representative shall be final <br /> as provided in 3.2. Owner's Representative. <br /> E. The Contractor's wage, payroll, and cost records pertaining to Work paid for on a Force <br /> Account basis shall be open to inspection or audit as provided in ARTICLE 17. AUDITS. <br /> 9.8 Force Account Labor. <br /> A. The Owner will reimburse the Contractor for labor and for supervision by foremen <br /> dedicated solely to the particular Force Account item of Work, but not for supervision by <br /> general superintendents or general foremen. The Owner's Representative will compute <br /> the labor payment on the basis of these four factors: <br /> Replacement of Reservoir 2 General Conditions <br /> WO# UP3658 00 72 13 - 54 <br />