My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Walsh Construction Company II LLC 6/7/2021
>
Contracts
>
Capital Contract
>
Walsh Construction Company II LLC 6/7/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2023 3:53:32 PM
Creation date
6/10/2021 3:42:47 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Walsh Construction Company II LLC
Approval Date
6/7/2021
Council Approval Date
4/21/2021
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Replacement of Reservoir 2
Public Works WO Number
UP3658
Tracking Number
0002940
Total Compensation
$0.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Walsh Construction II, LLC 8/24/2023 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Walsh Construction II, LLC 8/7/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1466
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
by the Owner. This results in the Gross Amount of Additional Home Office Overhead <br /> Compensation. <br /> 4. Adjusting the Gross Amount of Additional Home Office Overhead Compensation for <br /> any additional contribution for Overhead received by the Contractor on any Change <br /> Orders that are being presented and resolved concurrently with the subject <br /> calculation for Unabsorbed and/or Extended Home Office Overhead. The necessary <br /> adjustment would be to reduce the Gross Amount of Additional Home Office <br /> Overhead Compensation by any additional compensation for Overhead included in <br /> any direct cost claims being resolved concurrently with any claim for Extended and/or <br /> Unabsorbed Home Office Overhead. <br /> B. Contractor shall not receive compensation for cost of use of equity capital. <br /> 9.7 Force Account <br /> A. If Work or materials are to be paid for by Force Account, payment amounts will be <br /> determined and Contractor shall contemporaneously prepare, keep and maintain records <br /> segregated and allocated by time, location and item of Work in compliance with this <br /> subsection. Such records must be contemporaneously countersigned by the Owner or the <br /> Owner's Representative (or its designee). Any records not countersigned by the Owner or <br /> Owner's Representative shall be excluded from the calculation of payment under this <br /> subsection. <br /> B. The payments provided for herein shall be full payment for all Work done on a Force <br /> Account basis. The payment shall be deemed to cover all expenses of every nature, kind, <br /> and description, including all Overhead expenses, profit, occupational tax and any other <br /> Federal or State revenue acts, premiums on public liability and property damage insurance <br /> policies, and for the use of small tools and equipment for which no rental is allowed. Force <br /> Account is determined by Section 9.8 through 9.13 below. <br /> C. No Contract Claim for Force Account shall be allowed except upon written order by the <br /> Owner's Representative for Extra Work prior to the performance of the Extra Work. No <br /> Extra Work shall be construed as Force Account Work that can be measured under the <br /> Specifications and paid for at the unit prices or lump sum named in the Contract. <br /> D. The Owner's Representative shall compute the amount and costs of any Work to be paid <br /> by Force Account, and the amount certified by the Owner's Representative shall be final <br /> as provided in 3.2. Owner's Representative. <br /> E. The Contractor's wage, payroll, and cost records pertaining to Work paid for on a Force <br /> Account basis shall be open to inspection or audit as provided in ARTICLE 17. AUDITS. <br /> 9.8 Force Account Labor. <br /> A. The Owner will reimburse the Contractor for labor and for supervision by foremen <br /> dedicated solely to the particular Force Account item of Work, but not for supervision by <br /> general superintendents or general foremen. The Owner's Representative will compute <br /> the labor payment on the basis of these four factors: <br /> Replacement of Reservoir 2 General Conditions <br /> WO# UP3658 00 72 13 - 54 <br />
The URL can be used to link to this page
Your browser does not support the video tag.