ARTICLE 11. DIFFERING SITE CONDITIONS; (b) the Owner's Representative is not afforded <br /> reasonable access by the Contractor to complete records, including, but not limited to, <br /> correspondence, job diaries, and actual cost and additional time incurred; (c) a Contract <br /> Claim is not timely filed as required by the General Conditions; or (d) adequate, accurate, <br /> contemporaneous and segregated supporting time and expense records are not kept and <br /> maintained. The fact that the Contractor provided proper and timely Notice, provided a <br /> properly filed Contract Claim, or provided the Owner's Representative access to records of <br /> actual cost, shall not in any way be construed as proving or substantiating the validity of <br /> the Contract Claim. If the Owner determines the Contract Claim has merit in whole or in <br /> part, the Owner's Representative will make an adjustment of Contract Sum or Contract <br /> Time required for the work, or both. If the Owner's Representative finds the Contract <br /> Claim to be without merit, no adjustment will be made. <br /> B. The Contractor shall keep full, complete, accurate and contemporaneous records of the <br /> costs and additional time incurred for any alleged Contract Claim. The Contractor shall <br /> permit the Owner's Representative to have access to those records and any other records <br /> as may be required by the Owner's Representative to determine the facts or contentions <br /> involved in the Contract Claim. Owner is not obligated to respond to a Contract Claim <br /> unless the Contractor is in full compliance with all the provisions of the General Conditions <br /> and the formal Contract Claim document has been submitted. <br /> C. Full compliance by the Contractor with the provisions of this Article 12 is a contractual <br /> condition precedent to the Contractor's right to sue or seek any recovery against the <br /> Owner in any legal proceeding. <br /> 12.2 Contents <br /> A. All Contract Claims filed by the Contractor shall be in writing, verified under penalty of <br /> perjury by an officer or principal of the Contractor, and in sufficient detail to enable the <br /> Owner's Representative to ascertain the basis and amount of the Contract Claim. All <br /> Contract Claims shall be submitted to the Owner's Representative. At a minimum, each <br /> Contract Claim must include: <br /> 1. A detailed factual statement of the Contract Claim for additional compensation and <br /> extension of Contract Time, if any, providing all necessary dates, locations, and items <br /> of work affected by the Contract Claim. <br /> 2. The dates of all facts related to the Contract Claim. <br /> 3. The name of each Owner's individual, official, or employee involved in or <br /> knowledgeable about the Contract Claim. <br /> 4. The specific provisions of the Contract that support the Contract Claim and a <br /> statement of the reasons why such provisions support the Contract Claim. <br /> 5. If the Contract Claim relates to a decision of the Owner's Representative that the <br /> Contract leaves to the Owner's Representative's discretion or as to which the Contract <br /> provides that the Owner Representative's decision is final, the Contractor shall set out <br /> Replacement of Reservoir 2 General Conditions <br /> WO# UP3658 00 72 13 - 63 <br />