Laserfiche WebLink
in detail all facts supporting its position relating to the decision of the Owner's <br /> Representative. <br /> 6. Identification of any documents and the substance of any oral communications that <br /> support the Contract Claim. <br /> 7. Copies of any identified documents that support the Contract Claim, other than Owner <br /> documents and documents previously furnished to the Owner by the Contractor. <br /> Standard industry manuals may be incorporated by reference. <br /> 8. If Contractor seeks an extension of Contract Time: <br /> a. The specific amount of time (including days and dates) sought. <br /> b. The specific reasons the Contractor believes an extension of Contract Time should <br /> be granted, including, but not limited to, compliance with the requirements of <br /> 5.2.C. Extensions of Contract Time; and <br /> c. The specific provisions of the Contract Documents under which it is sought. <br /> 9. If additional compensation is sought, the exact amount sought and a breakdown of <br /> that amount into the following categories: <br /> a. Labor <br /> b. Materials <br /> c. Direct Equipment. The actual cost for each piece of equipment for which a <br /> Contract Claim is made or in the absence of actual cost, the rates established by <br /> the AGC/WSDOT Equipment Rental Agreement that was in effect when the work <br /> was performed. In no case shall the amounts sought or paid for each piece of <br /> equipment exceed the rates established by the Equipment Rental Agreement <br /> even if the actual cost for such equipment is higher. The Owner may audit the <br /> Contractor's cost records to determine actual equipment cost. The following <br /> information shall be provided for each piece of equipment: <br /> 1) Detailed description (e.g., Motor Grader Diesel Powered Caterpillar 12 "G", <br /> Tractor Crawler ROPS & Dozer Included Diesel) <br /> 2) The hours of use or standby; and <br /> 3) The specific day and dates of use or standby; <br /> 4) Job Overhead. <br /> 5) Overhead (general and administrative). <br /> 6) Subcontractor's contract claims (in the same level of detail as specified <br /> herein is required for all Subcontractor's contract claims); and <br /> 7) Other categories as specified by the Contractor or the Owner. <br /> 10. A notarized statement shall be submitted to the Owner's Representative containing <br /> the following language: <br /> Under the penalty of law for perjury or falsification, the undersigned, <br /> (name) (title) <br /> of <br /> Replacement of Reservoir 2 General Conditions <br /> WO# UP3658 00 72 13 - 64 <br />