Laserfiche WebLink
3. Before final payment is made on the account of this Contract, the Contractor shall, if <br /> requested by the Owner, furnish acceptable proof of a proper release from all such <br /> fees or claims. <br /> B. Should the Contractor, its agent, employee or any of them be enjoined from furnishing or <br /> using any invention, article, material or plans supplied or required to be supplied or used <br /> under this Contract, Contractor shall promptly pay such royalties and secure requisite <br /> licenses; or, subject to acceptance by Owner, substitute other articles, materials, or <br /> appliances in lieu thereof that are of equal efficiency, quality, finish, suitability and market <br /> value to those planned or required under the Contract. Descriptive information of these <br /> substitutions shall be submitted to the Owner's Representative for determination of <br /> general conformance to the design concept and the construction Contract. Should Owner <br /> elect to refuse the substitution, Contractor agrees to pay such royalties and secure such <br /> valid licenses as may be requisite for the Owner, its officers, agents and employees or any <br /> of them, to use such invention, article, material or appliance without being disturbed or in <br /> any way interfered with by any proceeding in law or equity on account thereof. <br /> ARTICLE 17 AUDITS <br /> 17.1 General <br /> A. Record Retention. <br /> 1. The Contractor's records relating to this Project, including, but not limited to, wage, <br /> payroll, and cost records, shall be open to inspection or audit by representatives of <br /> the Owner during the Project and for a period of not less than six years after the date <br /> of Final Acceptance of the Contract. <br /> a. The Contractor shall retain these records for that period. <br /> b. The Contractor shall also guarantee that Project records of Subcontractors, <br /> Suppliers, and lower tier Subcontractors, including, but not limited to, the wage, <br /> payroll, and cost records, shall be retained and open to similar inspection or audit <br /> for the same period of time. <br /> B. Audit Performance <br /> 1. The audit may be performed by employees or representatives of the Owner or by an <br /> auditor chosen by the Owner. <br /> 2. The Contractor, Subcontractors, or lower tier Subcontractors shall provide adequate <br /> facilities, reasonably acceptable to auditor,for the audit during normal business hours. <br /> 3. The Contractor, Subcontractors, or lower tier Subcontractors shall make a good faith <br /> effort to cooperate with the auditors. <br /> 4. If an audit is to be commenced more than sixty (60) days after the Final Acceptance <br /> date of the Contract, the Contractor will be given twenty (20) days' notice of the time <br /> when the audit is to begin. <br /> 5. If any litigation, claim, or audit arising out of, in connection with, or related to this <br /> Contract is initiated, the Project records shall be retained until the later of (a) <br /> Replacement of Reservoir 2 General Conditions <br /> WO# UP3658 00 72 13 - 80 <br />