My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Walsh Construction Company II LLC 6/7/2021
>
Contracts
>
Capital Contract
>
Walsh Construction Company II LLC 6/7/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2023 3:53:32 PM
Creation date
6/10/2021 3:42:47 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Walsh Construction Company II LLC
Approval Date
6/7/2021
Council Approval Date
4/21/2021
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Replacement of Reservoir 2
Public Works WO Number
UP3658
Tracking Number
0002940
Total Compensation
$0.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Walsh Construction II, LLC 8/24/2023 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Walsh Construction II, LLC 8/7/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1466
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT <br /> EVERETT Public Works <br /> WASHINGTON <br /> ADDENDUM NO. 2 <br /> TO <br /> REPLACEMENT OF RESERVOIR 2 <br /> W.O. # UP-3658 <br /> FEBRUARY 16, 2021 <br /> NOTICE TO PLANHOLDERS: <br /> Addendum No. 2 contains the following revisions, additions, deletions and clarifications and is <br /> hereby made a part of the contract documents for the above-named Project and shall be <br /> considered by all prospective bidders in submitting bids. <br /> Bidders must acknowledge receipt of Addendum No. 2 in the space provided in 00 41 13-1.5, <br /> Bid Form. Failure to comply with this requirement may render the Bid non-responsive and may <br /> cause its rejection. <br /> This Addendum consists of 16 pages, including all revisions, and attachments. <br /> The Bid date is modified by this Addendum, however, the time and location for receipt of Bids <br /> are unchanged by this Addendum. <br /> A request was made to provide "vectorized"drawings. Builders Exchange will be updated to <br /> provide directions how to access"vectorized" drawings. <br /> The sign-in sheet from the non-mandatory pre-bid meeting on February 10, 2021 is attached. <br /> THE CONTRACT DOCUMENTS ARE MODIFIED AS FOLLOWS: <br /> VOLUME 1, DIVISION 00 — PROCUREMENT AND CONTRACTING REQUIREMENTS <br /> ADVERTISEMENT FOR BIDS <br /> 1. In the first paragraph, delete "Tuesday, February 23, 2021" and replace with "Tuesday, <br /> March 16, 2021". <br /> SECTION 00 22 13, SUPPLEMENTAL INSTRUCTIONS TO BIDDERS <br /> 1. Part 1.2, A "Experience," insert the following two paragraphs and renumber the <br /> succeeding paragraphs accordingly: <br /> 7. Pipeline Contractor/Subcontractor: Within the last ten (10) years the Pipeline <br /> Contractor/Subcontractor must have completed at least three (3) projects that include <br /> the construction of welded joint steel pipe with a diameter of 36-inches or greater. <br /> 8. Pipeline Contractor/Subcontractor Superintendent: Within the last ten (10) <br /> years the Pipeline Contractor/Subcontractor superintendent must have completed at <br /> least two (2) projects that include the construction of welded joint steel pipe with a <br /> diameter of 36-inches or greater. <br /> Addendum 2 Page 1 <br /> CITY OF EVERETT • 3200 Cedar Street • Everett, WA 98201 • (425) 257-8800 • Fax(425) 257-8882 <br />
The URL can be used to link to this page
Your browser does not support the video tag.