My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Thomco Construction Inc. 6/14/2021
>
Contracts
>
Capital Contract
>
Thomco Construction Inc. 6/14/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 10:53:29 AM
Creation date
6/18/2021 10:03:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction Inc.
Approval Date
6/14/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement V
Public Works WO Number
UP3730
Tracking Number
0002953
Total Compensation
$1,924,004.26
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Thomco Construction Inc. 6/22/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> Project: The undertaking to be performed under the provisions of the Contract. <br /> Provide: Furnish and Install, complete in place. I <br /> Punch List: List of incomplete items of Work and of items of Work that do not conform <br /> to the requirements of the Contract Documents. The Punch List is prepared after <br /> Substantial Completion. I <br /> RCW: Means the Revised Code of Washington <br /> Schedule of Values: Allocation of Contract Sum to items of Work as described in 1- <br /> 09.9 PAYMENTS of these Special Provisions. <br /> Shall: Required conduct. <br /> Shown: Refers to information presented on the Plans, with or without reference to the <br /> Plans. <br /> Specify: Refers to information described, shown, noted or presented in any manner in <br /> the Contract. <br /> Submittals: The information required by the Contract Documents provided by <br /> Contractor to the City's Representative or City. <br /> Total Float: The amount of time a given activity or path of activities may be delayed <br /> before it will affect the Completion Date. <br /> Traffic: Both vehicular and non-vehicular traffic, such as pedestrians, bicyclists, <br /> wheelchairs, and equestrian traffic. <br /> Unabsorbed Overhead: The reduction or loss of contribution to recovery of the <br /> Contractor's Overhead costs realized by the result of reduced Project or Contractor <br /> billings, or both, due to any reason whatsoever, including a Project extension. <br /> Unit Price Work: Refers to items of Work identified by unit prices in the Proposal. I <br /> 1-02 BID PROCEDURES AND CONDITIONS <br /> 1-02.1 Pre qualifications of Bidders <br /> Delete 1-02.1 and substitute the following: <br /> 1-02.1******) Bidder Responsibility Criteria <br /> I1-02.1(1) Mandatory Bidder Responsibility Criteria <br /> (******) <br /> Bidder shall meet mandatory responsibility criteria in accordance with RCW <br /> 39.04.350(1). The City may require the Bidder to submit documentation demonstrating <br /> compliance with the criteria under this 1-02.1(1). The Bidder must: <br /> 1. Registration. Have a current certificate of registration as a contractor in compliance I <br /> with chapter 18.27 RCW, which must have been in effect at the time of Bid <br /> submittal; and <br /> 2. UBI. Have a current Washington Unified Business Identifier (UBI) number; and I <br /> 3. State Requirements. If applicable: <br /> a. Have Industrial Insurance (workers'compensation) coverage for the bidder's <br /> employees working in Washington, as required in Title 51 RCW; <br /> b. Have a Washington Employment Security Department number, as required in <br /> Title 50 RCW; and <br /> c. Have a Washington Department of Revenue state excise tax registration <br /> number, as required in Title 82 RCW. <br /> Water Main Replacement"V" Division 1 —GENERAL REQUIREMENTS April,2021 <br /> WO No—UP3730 SP—40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.