My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Thomco Construction Inc. 6/14/2021
>
Contracts
>
Capital Contract
>
Thomco Construction Inc. 6/14/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 10:53:29 AM
Creation date
6/18/2021 10:03:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction Inc.
Approval Date
6/14/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement V
Public Works WO Number
UP3730
Tracking Number
0002953
Total Compensation
$1,924,004.26
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Thomco Construction Inc. 6/22/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> 4. Disqualification. Not be disqualified from bidding on any public works contract <br /> under RCW 39.06.010 or 39.12.065(3). <br /> 5. Prevailing Wage Training. Unless Bidder has completed three or more public works <br /> projects and had a valid business license for three or more years, Bidder must have <br /> received Department of Labor and Industries training on the requirements related to <br /> public works and prevailing wage under RCW 39.12 and RCW 39.04. <br /> 5. Certification of Wage Compliance. Within the three-year period immediately <br /> preceding the date of the bid solicitation, not have been determined by a final and <br /> binding citation and notice of assessment issued by the department of labor and <br /> industries or through a civil judgment entered by a court of limited or general <br /> jurisdiction to have willfully violated, as defined in RCW 49.48.082, any provision of <br /> chapter 49.46, 49.48, or 49.52 ROW. <br /> 6. Apprentices. If the Project is subject to the apprenticeship utilization requirements <br /> in RCW 39.04.320, not have been found out of compliance by the Washington state <br /> ' apprenticeship and training council for working apprentices out of ratio, without <br /> appropriate supervision, or outside their approved work processes as outlined in <br /> their standards of apprenticeship under chapter 49.04 RCW for the one-year period <br /> immediately preceding the date of the bid solicitation. <br /> 1-02.1(2) Supplemental Bidder Responsibility Criteria <br /> (******) <br /> This Project will not be subject to supplemental bidder responsibility criteria. <br /> 1-02.2 Plans and Specifications <br /> ' Delete all paragraphs in 1-02.2 and substitute the following: <br /> Information as to where Bid Documents can be obtained or reviewed will be found in the <br /> Call for Bids (Advertisement for Bids) for the Work. <br /> ' After Award of the Contract, the Contractor will receive up to six sets of the reduced <br /> Plans (11" x 17") and accompanying Special Provisions. In addition, the Owner will <br /> supply up to three sets of full size plans (22" x 34"). All Plans and Special Provisions <br /> will be conformed with addenda unless Contractor requests otherwise. <br /> Additional Plans and Special Provisions may be purchased by payment of the current <br /> printing costs. <br /> 1-02.4 Examination of Plans, Specifications, and Site of Work <br /> 1-02.4(1) General <br /> Delete the fifth paragraph of 1-02.4(1), beginning with "Bid prices shall reflect", and <br /> substitute the following: <br /> Bid prices shall include everything necessary for the completion of the Work <br /> including, but not limited to, providing the materials, equipment, tools, plant and <br /> 1 other facilities, and the management, superintendence, labor, and all necessary <br /> testing services. <br /> Revise the first sentence in the paragraph that begins with "Any prospective Bidder <br /> desiring an explanation" to read as follows: <br /> Any prospective Bidder desiring an explanation or interpretation of the Bid <br /> Documents, shall request the explanation or interpretation in writing by close of <br /> business three business days preceding the bid opening to allow a written reply to <br /> reach all prospective Bidders before the submission of their Bids. <br /> Supplement 1-02.4(1) by adding the following: <br /> Water Main Replacement"V" Division 1 -GENERAL REQUIREMENTS April,2021 <br /> WO No-UP3730 SP-41 <br />
The URL can be used to link to this page
Your browser does not support the video tag.