My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Thomco Construction Inc. 6/14/2021
>
Contracts
>
Capital Contract
>
Thomco Construction Inc. 6/14/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 10:53:29 AM
Creation date
6/18/2021 10:03:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction Inc.
Approval Date
6/14/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement V
Public Works WO Number
UP3730
Tracking Number
0002953
Total Compensation
$1,924,004.26
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Thomco Construction Inc. 6/22/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> paving, channelization, illumination, signing, bridges, and retaining walls, if such <br /> ' construction is included in this Project. Except for the survey control data to be furnished <br /> by the City, calculations, surveying, and measuring required for setting and maintaining <br /> the necessary lines and grades shall be the Contractor's responsibility. The Contractor <br /> ' shall provide the City with copies of such calculations and staking data when requested <br /> by the Engineer. Copies of the City provided survey control data are available for the <br /> Bidder's inspection at the office of the Project Engineer. <br /> ' Any staking requirements for the Project that do not fit field conditions will be reviewed <br /> and if necessary adjusted by the Engineer. Any necessary revisions to the staking <br /> information will be provided to the Contractor for use in completing the Work. <br /> ' Stakes, marks, and other reference points, including existing monumentation, set by the <br /> City shall be carefully preserved by the Contractor. The Contractor will be charged for <br /> the costs of replacing stakes, markers and monumentation that were not to be disturbed <br /> but were destroyed or damaged by the Contractor's operations. This charge will be <br /> ' deducted from monies due or to become due to the Contractor. <br /> To facilitate the establishment of these lines and elevations, the City will provide the <br /> Contractor with the following survey control: <br /> ' ROADWAY, SURFACING AND PAVING <br /> Establish elevation bench marks and center or base line alignment control <br /> points for the mainline, one time only. Provide right of way stakes where <br /> applicable. <br /> Provide rights-of-way, easements or right-of-entry. <br /> Provide the Contractor with technical advice if requested. <br /> ' Computed grades where needed. <br /> Provide horizontal and vertical curve data. <br /> ' One copy of transit notes showing reference to horizontal and vertical control <br /> points. <br /> OTHER STRUCTURES <br /> ' Centerline or offset coordinates to centerline of the structure. <br /> A sufficient number of bench marks for levels to enable the Contractor to set <br /> grades at reasonably short distances. <br /> ' Monuments and control points as shown on the Plans. <br /> The Contractor shall give the City three weeks notification to allow adequate <br /> time to provide the above data. <br /> ' The Contractor shall ensure a surveying accuracy within the following tolerances: <br /> 1. Slope stakes ±0.1 foot <br /> 2. Subgrade blue tops ±0.01 foot <br /> ' 3. Stationing ±0.01 foot <br /> 4. Alignment ±0.01 foot <br /> 5. Surfacing red & yellow tops ±0.01 foot <br /> ' 6. Superstructure elevations ±0.01 foot (from plan elevations) <br /> 7. Substructure ±0.02 foot (from plan elevations) <br /> The Contractor shall slope stake the roadway before any construction may proceed. <br /> ' Slope stakes shall be set at 50' maximum intervals on tangents and 25' on curves. <br /> Subgrade bluetops and surfacing red and yellow tops shall be set at 50' intervals in <br /> tangent sections, 25' intervals in curve sections, and 10' intervals in intersection radii. <br /> Water Main Replacement"V" Division 1 -GENERAL REQUIREMENTS April,2021 <br /> WO No-UP3730 SP-59 <br />
The URL can be used to link to this page
Your browser does not support the video tag.