My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Thomco Construction Inc. 6/14/2021
>
Contracts
>
Capital Contract
>
Thomco Construction Inc. 6/14/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 10:53:29 AM
Creation date
6/18/2021 10:03:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction Inc.
Approval Date
6/14/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement V
Public Works WO Number
UP3730
Tracking Number
0002953
Total Compensation
$1,924,004.26
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Thomco Construction Inc. 6/22/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS I <br /> The Contractor's surveyor shall be a licensed surveyor in the State of Washington. The <br /> Contractor shall keep updated survey field notes in a standard field book and in a format I <br /> set by the Engineer. These field notes shall include all survey work performed by the <br /> Contractor's surveyor in establishing line, grade and slopes for the construction work. <br /> Copies of these field notes shall be provided to the Engineer upon request and upon I <br /> completion of the Contract Work; the field book shall be submitted to the Engineer and <br /> become property of the City. <br /> If the survey work provided by the Contractor does not meet the standards of the I <br /> Engineer, then the Contractor shall, upon the Engineer's written request, remove the <br /> individual or individuals doing the survey work and the survey work will be completed by <br /> the Engineer at the Contractor's expense. Costs for completing the survey work required <br /> by the Engineer will be deducted from monies due or to become due the Contractor. I <br /> The City may spot-check the Contractor's surveying. These spot-checks will not change <br /> the requirements for normal checking and testing as described elsewhere, and do not <br /> relieve the Contractor of the responsibility of producing a finished product that is in <br /> accordance with the Contract. <br /> In all disputes concerning accuracy of lines and elevations, the City shall be assumed <br /> correct and the Contractor shall correct the discrepancies before construction work may I <br /> proceed. No additional compensation will be paid for this corrective Work. <br /> Payment: The lump sum contract price for "Surveying" shall be full pay for all costs <br /> involved in furnishing all labor,tools, survey instruments, materials, and other equipment I <br /> necessary for the setting and maintaining of the alignment and grade as specified. <br /> 1-05.6 Inspection of Work and Materials <br /> Supplement 1-05.6 by adding the following: I <br /> 1-05.6(1) Demonstration of Compliance with Contract Requirements <br /> (******) <br /> The burden of proving the constructed Work complies with the Contract Documents shall I <br /> be on the Contractor at all times. The Contractor shall grant the City's Representative <br /> access to the Work and work site and to places where Work is being prepared, or where <br /> materials, Equipment, or machinery are being obtained for the Work. The Contractor I <br /> shall provide information requested by the City's Representative in connection with <br /> inspection work. <br /> If the Contract Documents, laws, ordinances, or public regulatory authority requires parts I <br /> of the Work to be specially inspected, tested, or approved, the Contractor shall give the <br /> City's Representative be not less than two working days prior written Notice of the <br /> availability of the subject Work for examination. <br /> Inspection and quality control tests performed on the Contractor's work by the City's I <br /> Representative shall not relieve the Contractor of its responsibility for errors or lack of <br /> quality therein and shall not be regarded as an assumption of risks or liability by the <br /> City's Representative for the Contractor's compliance with these Contract Documents. I <br /> Contractor remains responsible and liable for all errors, defects or a lack of quality not <br /> discovered by inspection or observation. <br /> 1-05.6(2) Manufacturer's Directions I <br /> (******) <br /> Manufactured articles, material and Equipment shall be transported, stored, applied, <br /> installed, connected, erected, adjusted, tested, operated and maintained as I <br /> recommended by the manufacturer, unless otherwise specified in these Special <br /> Provisions. Contractor shall provide manufacturer's installation instructions and <br /> Water Main Replacement"V" Division 1 —GENERAL REQUIREMENTS April, 2021 <br /> WO No—UP3730 SP—60 <br />
The URL can be used to link to this page
Your browser does not support the video tag.