My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Thomco Construction Inc. 6/14/2021
>
Contracts
>
Capital Contract
>
Thomco Construction Inc. 6/14/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 10:53:29 AM
Creation date
6/18/2021 10:03:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction Inc.
Approval Date
6/14/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement V
Public Works WO Number
UP3730
Tracking Number
0002953
Total Compensation
$1,924,004.26
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Thomco Construction Inc. 6/22/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS I <br /> The rights exercised under the provisions of this section shall not diminish the City's right <br /> to pursue any other avenue for additional remedy or damages with respect to the I <br /> Contractor's failure to perform the Work as required. <br /> 1-05.10 Guarantees <br /> Supplement 1-05.10 by adding the following: <br /> The Contractor further warrants to the City, the Engineer and the City's Representative <br /> that all materials and Equipment furnished under this Contract will be of highest quality <br /> and new unless otherwise specified by the City, free from faults and defects and in <br /> conformance with the Contract Documents. All Work not so conforming to these <br /> standards shall be considered defective. If required by the City's Representative, the <br /> Contractor shall furnish satisfactory evidence as to the kind and quality of materials and I <br /> Equipment. <br /> The Work furnished shall be of first quality and the workmanship shall be the best <br /> obtainable in the various trades. The Work shall be of safe, substantial and durable I <br /> construction in all respects. For a period of 365 calendar days, commencing on the date <br /> of Final Acceptance, the Contractor shall, upon the receipt of Notice in writing from the <br /> City, promptly make all repairs arising out of defective materials, workmanship, or <br /> Equipment at no cost to the City. The City is hereby authorized to make such repairs if, I <br /> 14 calendar days after giving of such Notice to the Contractor, the Contractor has failed <br /> to make or undertake the repairs with due diligence. In case of an emergency where, in <br /> the opinion of the City, delay could cause serious loss or damage, repairs may be made I <br /> prior to or concurrent with Notice being sent to the Contractor. All expenses in <br /> connection with such repairs will be charged to the Contractor. <br /> "Acceptance of the Work" shall not extinguish any covenant or agreement on the part of I <br /> the Contractor to be performed or fulfilled under this Contract that has not, in fact, been <br /> performed or fulfilled at the time of such acceptance. All covenants and agreements <br /> shall continue to be binding on the Contractor until they have been fulfilled. I <br /> The City and the Contractor agree that the guarantee on the completed portions of the <br /> Work possessed and used by the City shall commence as to those portions on the date <br /> that the City takes possession of those portions and so notifies the Contractor in writing. I <br /> City and Contractor further agree that such taking possession and use shall not be <br /> deemed as acceptance of the Work. Takeover of completed portions of the Work shall <br /> be at the City's option and will not be made until the Work can be put into routine service <br /> on a permanent basis. I <br /> The guarantee provided herein shall be in addition to those specific guarantee or <br /> warranty requirements for particular Equipment or Work items, or both, as indicated in <br /> the Specifications and Special Provisions. I <br /> 1-05.11 Final Inspection <br /> Delete 1-05.11 and substitute the following: <br /> 1-05.11 Final Inspections and Operational Testing I <br /> (******) <br /> 1-05.11(1) Substantial Completion Date I <br /> When the Contractor considers the Work to be substantially complete, the Contractor <br /> shall so notify the Engineer and request the Engineer establish the Substantial <br /> Completion Date. The Contractor's request shall list the specific items of Work that <br /> remain to be completed in order to reach physical completion. The Engineer will I <br /> schedule an inspection of the Work with the Contractor to determine the status of <br /> Water Main Replacement"V" Division 1 -GENERAL REQUIREMENTS April,2021 <br /> WO No-UP3730 SP-62 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.