My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Thomco Construction Inc. 6/14/2021
>
Contracts
>
Capital Contract
>
Thomco Construction Inc. 6/14/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 10:53:29 AM
Creation date
6/18/2021 10:03:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction Inc.
Approval Date
6/14/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement V
Public Works WO Number
UP3730
Tracking Number
0002953
Total Compensation
$1,924,004.26
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Thomco Construction Inc. 6/22/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> procedures to the City prior to installation of the manufactured articles, material and <br /> ' Equipment. <br /> 1-05.6(3) Materials and Equipment Furnished by City <br /> (******) <br /> Contractor shall install materials and Equipment furnished by the City as provided in the <br /> technical sections of the Specifications. Furnishing of material and Equipment by the <br /> City will be considered conclusive evidence of their acceptability for the purpose <br /> intended. If the Contractor discovers defects in material or Equipment furnished by the <br /> City, it shall immediately notify the City. After such discovery, the Contractor shall not <br /> proceed with Work involving City-furnished materials and Equipment unless authorized <br /> ' by the City. Unless otherwise noted or specifically stated, materials and Equipment <br /> furnished by the City, that are not of local occurrence or manufacture, are considered to <br /> be "FOB" railroad station or truck terminal nearest to the site of the Work. At no cost to <br /> the City, the Contractor shall unload, transport, store, and protect such material and <br /> ' Equipment from damage. The Contractor shall inspect such City-furnished material and <br /> Equipment on receipt and provide the City with written acceptance for the incorporation <br /> of said material and Equipment into the Work. After receipt by the Contractor, the <br /> ' Contractor bears all risk of loss and casualty to City furnished materials and Equipment. <br /> 1-05.7 Removal of Defective and Unauthorized Work <br /> Supplement 1-05.7 by adding the following: <br /> ' If the Contractor fails to remedy defective or unauthorized Work within the time specified <br /> in a written notice from the Engineer, or fails to perform Work required by the Contract <br /> Documents, the Engineer may correct and remedy such Work as may be identified in <br /> ' the written notice, with City forces or by such other means as the City may deem <br /> necessary. <br /> If the Contractor fails to comply with a written order to remedy what the Engineer <br /> determines to be an emergency situation, the Engineer may have the defective and <br /> unauthorized Work corrected immediately, have the rejected Work removed and <br /> replaced, or have Work the Contractor refuses to perform completed by using City or <br /> ' other forces. An emergency situation is a situation when, in the opinion of the Engineer, <br /> a delay in its remedy could be potentially unsafe, or might cause serious risk of loss or <br /> damage to the public. <br /> Direct or indirect costs incurred by the City attributable to correcting and remedying <br /> ' defective or unauthorized Work, or Work the Contractor failed or refused to perform, <br /> shall be paid by the Contractor. Payment will be deducted by the Engineer from monies <br /> due, or to become due, the Contractor. Such direct and indirect costs shall include in <br /> particular, but without limitation, compensation for additional professional services <br /> required, and costs for repair and replacement of Work of others destroyed or damaged <br /> by correction, removal, or replacement of the Contractor's unauthorized Work. <br /> ' In its sole discretion,the City may retain Work that is not in compliance with the Contract. <br /> The City will determine the just and reasonable value for such defective Work and <br /> deductions will be made in the payments due or to become due to the Contractor. Final <br /> ' Acceptance will not act as a waiver of the City's right to recover from the Contractor an <br /> amount representing the deduction for retention of defective Work. <br /> No adjustment in Contract Time or Contract Sum will be allowed because of the Delay <br /> ' in the performance of the Work attributable to the exercise of the City's rights provided <br /> by this section. <br /> Water Main Replacement"V" Division 1 -GENERAL REQUIREMENTS April, 2021 <br /> WO No-UP3730 SP-61 <br />
The URL can be used to link to this page
Your browser does not support the video tag.