My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Thomco Construction Inc. 6/14/2021
>
Contracts
>
Capital Contract
>
Thomco Construction Inc. 6/14/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 10:53:29 AM
Creation date
6/18/2021 10:03:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction Inc.
Approval Date
6/14/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement V
Public Works WO Number
UP3730
Tracking Number
0002953
Total Compensation
$1,924,004.26
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Thomco Construction Inc. 6/22/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> Guidelines for Water Main Volume <br /> ' Inside Dia.(in) Volume per 100 LF <br /> (gal) <br /> ' 4 65 <br /> 6 147 <br /> 8 261 <br /> 10 408 <br /> ' 12 587 <br /> 20 1,632 <br /> Provide taps and other appurtenances required for temporary release of air, <br /> chlorination, or flushing purposes as a part of the Work. <br /> To protect aquatic life in receiving waters, neutralize the chlorine contained in the <br /> discharge water before disposing into a natural drainage channel or feature draining <br /> to a natural channel. Dispose of disinfecting solutions to the satisfaction of the City <br /> of Everett and the Washington Department of Ecology. Discharge water disposal <br /> may be directed to an available sanitary sewer, if approved by the Engineer and <br /> provided the rate of disposal will not overload the sewer. <br /> 7-09.3(24)B Disinfectant Concentration and Retention Period (Contact <br /> ' Interval) <br /> Provide disinfection concentration necessary to obtain a free chlorine residual of <br /> not less than 10 mg/1 remaining in the disinfectant solution after a 24 hour contact <br /> ' time. Provide the initial free chlorine residual concentration of disinfectant solution <br /> not less than 25 mg/I. Contractor may reduce disinfectant chlorine solution contact <br /> time from 24 to 12 hours by using an initial disinfectant concentration of 50 mg/I. <br /> Maximum allowable disinfectant concentration shall be 50 mg/I. The ending <br /> concentration of an initial 50 mg/I solution following a 12 hour contact time shall be <br /> not less than 10 mg/I. <br /> ' 7-09.3(24)C Form of Applied Chlorine <br /> Perform disinfection of water mains using the continuous feed method employing <br /> either liquid calcium hypochlorite or liquid sodium hypochlorite solutions. Dry <br /> ' calcium hypochlorite and gaseous or liquid chlorine is not allowed. <br /> Follow the continuous feed methods specified in the most recent version of AWWA <br /> Standard C-651 and Section 5-15 of the latest edition of the City of Everett "Design <br /> and Construction Standards and Specifications for Development", except for the <br /> City's prohibition on the use of dry calcium hypochlorite or gaseous chlorine. <br /> 7-09.3(24)D Point of Application <br /> ' Whenever possible, use the beginning of the pipeline extension, or a valved section <br /> of it, as the point of application for the disinfectant solution. Provide a tap to supply <br /> water for delivering the disinfectant solution on the pressure, or upstream, side of <br /> the valve controlling the flow into the pipeline extension, but downstream of the <br /> backflow preventer used to isolate the new main from the existing water distribution <br /> system. Obtain Engineer approval in writing to use alternate points of applications. <br /> ' For a City allowed direct tie-in to an existing main via an in-line backflow preventer <br /> and with the approval of the Inspector, the point of application may be through a <br /> corporation stop inserted in the horizontal axis of the pipe. Locate tap within 10- <br /> feet of where the line is tied into the existing system. Swab the internal surfaces of <br /> the backflow preventer and adjacent downstream appurtenances, valves or <br /> couplings for example, with straight hypochlorite solution prior to their installation. <br /> Water Main Replacement"V" Division 7-STORM,SEWER,WATER April, 2021 <br /> WO No.-UP3730 SP-177 ADDENDUM#1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.