My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Thomco Construction Inc. 6/14/2021
>
Contracts
>
Capital Contract
>
Thomco Construction Inc. 6/14/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 10:53:29 AM
Creation date
6/18/2021 10:03:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction Inc.
Approval Date
6/14/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement V
Public Works WO Number
UP3730
Tracking Number
0002953
Total Compensation
$1,924,004.26
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Thomco Construction Inc. 6/22/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS I <br /> 7-09.3(24) Disinfection of Water Mains I <br /> Delete 7-09.3(24), including subsections, and substitute the following: <br /> 7-09.3(24) Flushing and Disinfection of Water Mains I <br /> (******) <br /> Flush, disinfect with a chlorine solution and obtain passing coliform bacteria test reports <br /> before placing new water mains or extensions to existing mains in service. Submit I <br /> flushing and disinfection procedures in accordance with this section. Provide submittal <br /> containing, at a minimum: <br /> ❑ location of taps and other appurtenances used for chlorination and flushing <br /> purposes, <br /> • location of the sample collection taps, <br /> • disposal location and treatment procedure for chlorinated water discharged I <br /> from the mains, and <br /> • procedure for disinfection including application method, point of application, <br /> and target concentrations for the contact interval being used. <br /> 7-09.3(24)A Flushing I <br /> Flush sections of pipe being disinfected to remove solids that may have become <br /> lodged in the pipe. Provide a tap sufficient to provide a flush velocity inside the main I <br /> of at least 2.5 fps if no hydrant is installed at the end of the main. Flush as long as <br /> material or color is visible in the discharge. Flush at a minimum one full pipe volume <br /> of water from the section of new main being tested. <br /> Guidelines for Required Flow and Openings to Flush Pipelines I <br /> (assumes 40 psi residual pressure in water main) <br /> Pipe Dia. Flow Required Size of Tap (in) Number of <br /> (in.) to Produce 2.5 2 1/z" Hydrant <br /> fps (approx) outlets <br /> Velocity in Main 1 1 1/2 2 <br /> (gpm) (in) (in) (in) <br /> 4 100 1 1 <br /> 6 200 1 1 I <br /> 8 400 2 1 1 <br /> 10 600 3 2 1 <br /> 12 900 2 2 I <br /> 16 1,600 4 2 <br /> I <br /> I <br /> I <br /> I <br /> I <br /> Water Main Replacement"V" Division 7—STORM, SEWER,WATER April, 2021 IIWO No.—UP3730 SP—176 ADDENDUM#1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.