Laserfiche WebLink
111 CITY OF EVERETT SPECIAL PROVISIONS <br /> 1-07.3 Forest Protection and Merchantable Timber Requirements <br /> Delete 1-07.3 in its entirety. <br /> 1-07.5 Environmental Regulations <br /> 1-07.5(4) Air Quality <br /> Delete all of 1-07.5(4) and substitute the following: <br /> The Contractor shall comply with all rules of the Puget Sound Clean Air Agency <br /> ' (PSCAA) (800-552-3565). These rules include PSCAA Regulation I. Excerpts of <br /> Regulation I are included in the Appendix D as it relates to fugitive dust control. The <br /> Contractor shall submit a dust control plan including dust control measures for its <br /> activities related to this Contract that may cause dust. This plan shall be submitted <br /> to the Engineer prior to commencing activity at the job site. <br /> 1-07.6 Permits and Licenses <br /> Supplement 1-07.6 by adding the following: <br /> A City of Everett business license is required for the Contractor and the Contractor's <br /> Subcontractors prior to commencing construction on this Contract. <br /> ' Contractor shall obtain all necessary permits required by law and the City of Everett. <br /> All general building, electrical, plumbing permits will be issued at no cost to the <br /> Contractor. In addition, obtain all required permits for waste disposal sites. Waste <br /> disposal sites shall be in the United States, unless otherwise expressly stated in the <br /> Contract Documents or the City gives prior written approval. <br /> A portion of this project is located in the separated sewer area (Olympic and <br /> Ridgemont, STA 10+00 to 32+50). The Project has more than one acre of total <br /> disturbed area within this part of the project limits and requires coverage under the <br /> Construction Stormwater General Permit (CSWGP). The contractor shall apply for <br /> and obtain coverage for the project as soon as possible after award of the contract <br /> ' in order to facilitate the project schedule. The Contractor shall assume <br /> responsibility for the requirements of the CSWGP by developing a Construction <br /> Stormwater Pollution Prevention Plan (SWPPP)prior to beginning construction, and <br /> complying with the requirements of the permit. Criteria and requirements for <br /> developing a SWPPP can be found in Volume II of the 2019 Ecology Manual. A link <br /> to the Manual can be found using the following URL: <br /> ' https://apps.ecology.wa.gov/publications/SummaryPages/1910021.html <br /> A link to the Ecology website to apply for the CSWG can be found at the following <br /> URL: <br /> ' https://ecology.wa.gov/Regulations-Permits/Permits-certifications/Stormwater- <br /> general-perm its/Construction-stormwater-permit <br /> Contact Ecology to determine if other requirements apply to the Project. <br /> NW Region DOE phone: 425-649-7000 <br /> Include all cost incurred for obtaining the CONSTRUCTION STORMWATER <br /> GENERAL PERMIT in appropriate bid item or items as no direct compensation <br /> will be made. <br /> The remainder of the project is in the combined sewer area and not required to meet <br /> NPDES Municipal Permit Requirements. <br /> 1-07.9 Wages <br /> 1-07.9(1) General <br /> ' Delete the first paragraph of 1-07.9(1) and substitute the following: <br /> Water Main Replacement"V" Division 1 —GENERAL REQUIREMENTS April,2021 <br /> WO No—UP3730 SP-75 <br />