Laserfiche WebLink
' CITY OF EVERETT SPECIAL PROVISIONS <br /> ' On mains exceeding 1,200 feet, provide for sample collection at one of the water <br /> services shown on the Plans. If no water services are shown on the Plans, provide <br /> 3/4-inch sampling tap at appropriate locations along the main. <br /> ' For mid-line service taps not providing future customer service, plumb into dead- <br /> end meter setters and meter boxes at the street or sidewalk edge for use as future <br /> dedicated sampling locations in accordance with COE Standard Drawing No. 526. <br /> ' Locate sample tap upstream of the flushing hose connection for bacterial and <br /> disinfectant residual sampling. Due to sanitary and representative sampling issues, <br /> use only installed sample taps for collection of free chlorine or bacteriological <br /> ' samples. <br /> 7-09.3(24)J Repetition of Flushing and Testing <br /> Should the initial disinfection procedure result in an unsatisfactory bacteriological <br /> test, meaning total coliform bacteria is present, repeat the entire flushing and <br /> disinfection procedure until obtaining satisfactory test results. Unsatisfactory test <br /> results indicates Contractor's failure to keep the pipe, sample taps, and temporary <br /> filling attachments clean during construction, or to properly flush and disinfect the <br /> main. <br /> Supplement 7-09.3 by adding the following: <br /> 7-09.3(25) Mechanical Joint Restraining Devices <br /> (******) <br /> ' Restrain joints at bends, tees, dead ends and connections to existing water mains as <br /> shown on the Plans using mechanical joint restraining devices. <br /> Install joint restraint system in accordance with the manufacturer's recommendations. <br /> ' 7-09.4 Measurement <br /> Delete all paragraphs of 7-09.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B — Bid Item Descriptions of these Special Provisions and Section <br /> 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 7-09.5 Payment <br /> Delete all paragraphs of 7-09.5 and substitute the following: <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 7-12 VALVES FOR WATER MAINS <br /> 7-12.1 Description <br /> Supplement 7-12.1 as follows: <br /> ' 7-12.1(1) Submittals <br /> (******) <br /> Provide Type 2 Working Drawings for all materials and Standard Plans. <br /> ' 7-12.2 Materials <br /> Delete the first paragraph in 7-12.2 and substitute the following <br /> Provide materials meeting the requirements of the following: <br /> ' Gate Valves (2-inches to 12-inches) 9-30.3(1) Special Provisions <br /> Valve Boxes 9-30.3(4) Special Provisions <br /> Valve Stem Extensions 9-30.3(6) Special Provisions <br /> ' Tapping Sleeve and Valve 9-30.3(8) Special Provisions <br /> Water Main Replacement"V" Division 7—STORM,SEWER,WATER April, 2021 <br /> WO No.—UP3730 SP—179 ADDENDUM#1 <br />