CITY OF EVERETT SPECIAL PROVISIONS <br /> Assembly , <br /> 7-12.3 Construction Requirements <br /> Supplement 7-12.3 by adding the following: <br /> Install valve box centered on the operator nut. <br /> Provide 3-inch thick x 2-feet x 2-feet HMA concrete pad around valve boxes located <br /> within gravel surface. , <br /> Provide one valve stem extension, minimum 12-inch length, in accordance with COE <br /> Standard Drawing No. 505 when the top of the valve operating nut is more than three <br /> feet below finished grade. , <br /> Provide equipment, labor, tools, materials and miscellaneous parts to perform pavement <br /> sawing, pavement removal, excavations, shoring, traffic control and other Work required <br /> to prepare the site for City Utility Department personnel to install the City supplied , <br /> tapping sleeve and valve assembly. <br /> Notify City Utility Department a minimum of five business days for each tap being made. <br /> The Utility Department will determine the date and time to make each tap. I <br /> Expose the water main being hot tapped, including properly shoring the excavation in <br /> accordance with requirements of WISHA, RCW 49.17 including WAC 296-155. Should <br /> City personnel determine the excavation and shoring do not meet the requirements of <br /> WISHA, RCW 49.17, including WAC 296-155, City personnel will notify Contractor to <br /> make necessary modifications to bring the excavation and shoring into compliance prior <br /> to City personnel entering the trench. ' <br /> Once the conditions are deemed safe for City personnel to enter the trench, City will <br /> install the tapping sleeve and valve assembly and Utility Department personnel will <br /> perform the hot tapping of the existing main. . Upon City Utility Department personnel <br /> completing installing and testing the tapping sleeve and valve assembly. City Utility <br /> Department personnel will connect to Contractor's installed pipe upon Contractor's <br /> successful completion and testing of Contractor installed water main. Backfill, compact, <br /> and restore the area. <br /> Where shown on the Plans, adjust existing valve boxes and covers to the grade as <br /> staked or otherwise designated by the Engineer. Using riser rings to adjust the valve <br /> box to grade is not allowed. <br /> Conduct removal operations conducted to prevent damage to the valve boxes. Replace <br /> parts or materials damaged due to the Contractor's operations at his expense. <br /> Conduct valve box adjustments so the final adjusted valve box allows full operation of <br /> the valve. Remove debris from the adjusted valve boxes to ensure full valve operation. <br /> Delete the third sentence of the first paragraph in 7-12.3(1) and substitute the following: <br /> Where shown on the Plans, provide valve marker post with the exposed portion having <br /> the letter "V" and the distance in feet to the valve stenciled in black paint on the post. <br /> Provide a two inch high stencil to produce the letters and numerals. <br /> 7-12.4 Measurement <br /> Delete all paragraphs of 7-12.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B — Bid Item Descriptions of these Special Provisions and Section <br /> 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 7-12.5 Payment <br /> Delete all paragraphs of 7-12.5 and substitute the following: <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> Water Main Replacement"V" Division 7-STORM, SEWER,WATER April, 2021 <br /> WO No.—UP3730 SP—180 ADDENDUM#1 <br />