My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Thomco Construction Inc. 6/14/2021
>
Contracts
>
Capital Contract
>
Thomco Construction Inc. 6/14/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 10:53:29 AM
Creation date
6/18/2021 10:03:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction Inc.
Approval Date
6/14/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement V
Public Works WO Number
UP3730
Tracking Number
0002953
Total Compensation
$1,924,004.26
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Thomco Construction Inc. 6/22/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS , <br /> used as subcontractors, lower tier subcontractors, manufacturers, regular dealers, or <br /> service providers on the Contract. This certification shall be submitted to the Engineer <br /> on WSDOT form 140-542 within 20 calendar days after physical completion of the <br /> Contract. <br /> Supplement 1-08.1 by adding the following: <br /> The Contract Documents shall apply to Subcontractors and suppliers as if each had <br /> signed the Contract with the City. Contractor shall include the provisions of these <br /> Contract Documents or a "flow down" clause in each contract with Subcontractors and <br /> suppliers. <br /> The City will not approve a Subcontractor that is also providing services to the City on <br /> the same project. <br /> No Subcontractor or lower tier subcontractor will be permitted to perform Work under the <br /> Contract until the following documents have been completed and submitted to the <br /> Engineer: <br /> 1. Request to Sublet Work (Form 421-012), and <br /> 2. Contractor and Subcontractor or Lower Tier Subcontractor Certification for <br /> Federal-aid Projects (Form 420-004). <br /> The Contractor's records pertaining to the requirements of this Special Provision shall <br /> be open to inspection or audit by representatives of the City during the life of the Contract <br /> and for a period of not less than three years after the date of acceptance of the Contract. 111 <br /> The Contractor shall retain these records for that period. The Contractor shall also <br /> guarantee that these records of all Subcontractors and lower tier subcontractors shall <br /> be available and open to similar inspection or audit for the same time period. <br /> Contractor shall not sublet to a single Subcontractor more than one-half of the Project. <br /> The City may refuse to approve any subcontract for any reason. Subcontractors will be <br /> considered agents of the Contractor and their work shall be subject to the provisions of <br /> the Contract. References in the Contract Documents to actions required of <br /> Subcontractors, manufacturers, suppliers, or any person other than the Contractor, the <br /> City or the City's Representative shall be interpreted as requiring that the Contractor <br /> shall require such Subcontractor, manufacturer, supplier or person to perform the <br /> specified action. <br /> 1-08.3 Progress Schedule <br /> 1-08.3(1) General Requirements <br /> Delete 1-08.3(1) and substitute the following: <br /> 1-08.3(1) General <br /> (******) 1 <br /> Because time is of the essence, diligent and expeditious progress and completion of the <br /> Work by the Contract Completion Date is required of the Contractor. Careful, adequate, <br /> accurate and complete planning and scheduling of the Work by the Contractor, both prior <br /> to the start of, and throughout, construction, is vital to the success of this Project for both <br /> the Contractor and the City. The purposes of the schedules and reports include: <br /> 1. Ensuring adequate planning and execution of the Work by the Contractor. <br /> 2. Assisting the City or its representative in monitoring construction. <br /> 3. Assessing the impact of any actual, potential or proposed change, including, <br /> but not limited to, the financial impact resulting from schedule changes and <br /> changes to the scope of Work. <br /> 4. Supporting the basis for construction payments. <br /> Water Main Replacement"V" Division 1 -GENERAL REQUIREMENTS April, 2021 <br /> WO No-UP3730 SP-90 <br /> I <br />