My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Thomco Construction Inc. 6/14/2021
>
Contracts
>
Capital Contract
>
Thomco Construction Inc. 6/14/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 10:53:29 AM
Creation date
6/18/2021 10:03:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction Inc.
Approval Date
6/14/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement V
Public Works WO Number
UP3730
Tracking Number
0002953
Total Compensation
$1,924,004.26
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Thomco Construction Inc. 6/22/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> 5. Planning by City and tenants. <br /> 6. Avoiding additional or extra costs or expenses to the City. <br /> All schedules will be reviewed by the City and the City's Representative. The City or <br /> City's Representative's review of any schedule shall not transfer the Contractor's <br /> responsibilities to the City. Review shall not constitute approval or acceptance of the <br /> Contractor's construction means, methods, sequencing, logic, order, precedence and <br /> succession of activities or Contractor's ability to complete the Work in a timely manner. <br /> Any mistakes or errors in any schedule, including, but not limited to, mistakes or errors <br /> of logic, order, precedence, and duration, are and remain the Contractor's. The City or <br /> City's Representative may, however, comment upon the schedule. The Contractor <br /> remains wholly responsible for completing the Work within the Contract duration. Any <br /> comments by City or City's Representative personnel regarding the schedule shall not <br /> be construed as approval or ratification, nor shall the Contractor incorporate or change <br /> its schedule as a result of City or City's Representative comments in the absence of an <br /> express written directive to that effect. <br /> Contractor shall submit, update and maintain schedules as required by the Contract <br /> Documents. <br /> The Contractor shall provide sufficient material, equipment, and labor to meet the interim <br /> milestones, Substantial Completion, Physical Completion and Completion Dates <br /> provided by the Contract Documents. The City allocates its resources to a Contract <br /> ' based on the total time allowed in the Contract. The Contractor may submit a schedule <br /> indicating Completion Date earlier than the end of Contract Time, but City cannot <br /> guarantee its resources will be available to meet such schedule. City shall not pay or be <br /> ' liable for any additional compensation if the Contractor is not able to meet a schedule <br /> that indicates a Completion Date earlier than the end of Contract Time. <br /> Failure to schedule City furnished or installed materials and Equipment for installation <br /> ' on or after its planned arrival pursuant to the City's Contract with the supplier or failure <br /> to notify the City in writing of tasks dependent upon the fact or date of arrival of such <br /> City furnished materials and Equipment, constitute a waiver by Contractor of any <br /> Contract Claim arising out of or related to the timeliness of the furnishing or installation <br /> of such material and Equipment. All schedules shall allow for timely incorporation of any <br /> other's work under separate contract with City and for timely incorporation of any work <br /> provided and installed by City. Unless otherwise expressly authorized in writing by the <br /> ' City's Representative, the Contractor shall integrate the schedules with the Schedule of <br /> Values and unit price items so that each construction activity is represented by a dollar <br /> value. <br /> ' Float in a progress schedule belongs to the City. <br /> Subcontractors shall review all schedules prior to submission to the City and City's <br /> Representative. At the City's option and sole discretion, City may require Contractor to <br /> obtain written acceptance of each schedule by Subcontractors as practical and feasible, <br /> as the schedule relates to Subcontractors'work. <br /> Contractor shall not schedule any activity with an unrealistic, unduly long, or unduly short <br /> ' duration. Contractor shall use its best efforts in good faith to set reasonable durations <br /> for all activities. Contractor shall not attempt to "grab the Float" or make an effort to use <br /> Float in the Progress Schedule for the benefit of the Contractor, rather than the benefit <br /> of the Project. Contractor shall use its best efforts in good faith to minimize <br /> dependencies, minimize the number of critical paths, and schedule the Project to be <br /> complete as expeditiously as reasonably possible. <br /> Contractor shall submit with each application for payment or progress pay estimate an <br /> updated progress schedule, but no less often than monthly. If requested by the City's <br /> Water Main Replacement"V" Division 1 -GENERAL REQUIREMENTS April,2021 <br /> WO No-UP3730 SP-91 <br />
The URL can be used to link to this page
Your browser does not support the video tag.