Laserfiche WebLink
' CITY OF EVERETT SPECIAL PROVISIONS <br /> 7-14 HYDRANTS <br /> 7-14.1 Description <br /> ' Supplement 7-14.1 as follows: <br /> 7-14.1(1) Submittals <br /> (******) <br /> ' Provide Type 2 Working Drawings for all materials and Standard Plans. <br /> 7-14.2 Materials <br /> Delete the material list in 7-14.2 and substitute the following: <br /> Provide materials meeting the requirements of the following: <br /> Hydrants 9-30.5 Special Provisions <br /> 7-14.3 Construction Requirements <br /> 7-14.3(1) Setting Hydrants <br /> Delete the first and second paragraphs in 7-14.3(1) and substitute the following: <br /> ' Provide fire hydrant assemblies in accordance with City of Everett Standard <br /> Drawing No. 507 and 508. <br /> ' Revise the first sentence of the fourth paragraph to read as follows: <br /> Paint hydrants in accordance with Part L in COE Standard Drawing No. 507. <br /> ' Supplement 7-14.3(1) as follows: <br /> Consider a hydrant in service when it is installed in working order in accordance <br /> with the Plans and Specifications. <br /> ' 7-14.3(2) Hydrant Connections <br /> Delete the first paragraph in 7-14.3(2) and substitute the following: <br /> Provide continuous 6-inch diameter ductile iron pipe from the auxiliary gate valve at <br /> the main to the hydrant in accordance with COE Standard Drawing 507. <br /> Provide mechanical joint restraining glands conforming to 9-30.2(6) of these Special <br /> ' Provisions. <br /> 7-14.3(2)A Hydrant Restraints <br /> Revise the first paragraph in 7-14.3(2)A to read as follows: <br /> Restrain thrust created in short hydrant laterals of one pipe length or less using <br /> mechanical retainer glands at the auxiliary valve and hydrant fittings as shown <br /> in the COE Standard Drawing No. 507. For longer hydrant leads requiring two <br /> ' or more pipe lengths, Contractor may use field lock gaskets in lieu of <br /> mechanical joint restraint system to restrain the number of pipe joints between <br /> the auxiliary valve and the hydrant. <br /> ' 7-14.3(2)B Auxiliary Gate Valves and Valve Boxes <br /> Revise the first paragraph in 7-14.3(2)B to read as follows: <br /> Provide auxiliary gate valves and valve boxes in accordance with Section 7-12 <br /> and COE Standard Drawing No. 507. <br /> 7-14.3(2)C Hydrant Guard Posts <br /> ' Revise the first paragraph in 7-14.3(2)C to read as follows: <br /> Provide hydrant guard posts at the locations shown on the Plan and in <br /> accordance with COE Standard Drawing No. 508. <br /> ' 7-14.3(4) Moving Existing Hydrants <br /> Delete third and fourth sentences in the first paragraph in 7-14.3(4) and substitute the <br /> following: <br /> Water Main Replacement"V" Division 7-STORM,SEWER,WATER April, 2021 <br /> WO No.-UP3730 SP-181 ADDENDUM#1 <br />