My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Thomco Construction Inc. 6/14/2021
>
Contracts
>
Capital Contract
>
Thomco Construction Inc. 6/14/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 10:53:29 AM
Creation date
6/18/2021 10:03:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction Inc.
Approval Date
6/14/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement V
Public Works WO Number
UP3730
Tracking Number
0002953
Total Compensation
$1,924,004.26
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Thomco Construction Inc. 6/22/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> 7. Cost associated with preparation and distribution of public notices involving <br /> parking, street access or traffic issues. <br /> 111 <br /> Upon failure of the Contractor to immediately provide flaggers, erect, maintain, and <br /> remove signs; or provide, erect, maintain, and remove other traffic control devices when <br /> ordered to do so by the Engineer, the City may without further notice to the Contractor <br /> or the Surety, perform any of the above and deduct all or the costs from the Contractor's <br /> payments. <br /> The Contractor shall be responsible for providing adequate flaggers, signs, and other <br /> traffic control devices for the protection of the worker and the public at all times <br /> regardless of whether or not the flaggers, signs, and other traffic control devices are <br /> ordered by the Engineer, or paid for by the City. The Contractor shall be liable for injuries <br /> and damages to persons and property suffered by reason of the Contractor's operations <br /> or negligence in connection therewith. <br /> 1-10.3(3) No Passing Zones <br /> The striping of no passing zones that are to be obliterated in excess of 150-feet by paving <br /> operations shall be replaced by "Do Not Pass" and "Pass With Care" signs. The signs <br /> shall be located not less than 2-feet outside the usable shoulder nor less than 7-feet <br /> above the edge of pavement. The number of necessary signs will be specified in the i <br /> Special Provisions. ■ <br /> The Contractor shall provide and install the signs and sign posts. The signs shall be <br /> maintained by the Contractor until construction operations are complete. When the <br /> project includes striping by the Contractor, the signs and posts shall be removed by the <br /> Contractor when the no passing zones are re-established by striping. <br /> When the Contractor is not responsible for striping, the signs and posts shall be removed <br /> by the Contractor when the "No Passing Zones"are re-established by striping. Payment <br /> to perform the Work required for this subsection will be under the item "Maintenance and <br /> Protection of Traffic Control." <br /> 1-10.3(4) Traffic Control Labor <br /> The Contractor shall furnish all personnel for flagging to control traffic during construction <br /> operations. Flaggers shall have a current certification (Flagging Card) from the State <br /> Department of Labor and Industries (WAC 296-155-305). Employees of the Contractor <br /> engaged in flagging or traffic control shall wear reflective vests and hard hats. During <br /> hours of darkness, white coveralls or white or yellow rain gear shall also be worn. The <br /> vests and other apparel shall be in conformance with Section 1-07.8. The Contractor111 <br /> shall furnish the MUTCD standard Stop/Slow paddles, except the minimum width shall <br /> be 24-inches, for the flagging operations. During hours of darkness flagger stations shall <br /> be illuminated to insure that flaggers can be easily seen without causing glare to the <br /> traveling public. The Contractor shall develop and use a method to ensure that flaggers <br /> have adequate warning of objects approaching from behind the flagger. <br /> All flaggers shall start a new job with an on-site orientation. This orientation must <br /> include, but not be limited to, the flagger's role and location on the job site, equipment, <br /> traffic patterns, communications and hazards specific to the work site. <br /> If off-duty uniformed police officers are not available for traffic control for Work within <br /> signalized intersections, Contractor may provide four flaggers. Flaggers are not <br /> permitted within the intersection. Each flagger shall control only one approach and be <br /> stationed near the stop bar. Provide a minimum of a series of three warning signs in <br /> advance of each flagger. Narrow multi-lane approaches to a single lane approaching <br /> the flagger. Provide and require all flaggers use two-way radios to signal each other to <br /> prevent conflicts and hold traffic when construction activities require. <br /> Water Main Replacement"V" Division 1 —GENERAL REQUIREMENTS April,2021 111 <br /> WO No—UP3730 SP—126 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.