My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Thomco Construction Inc. 6/14/2021
>
Contracts
>
Capital Contract
>
Thomco Construction Inc. 6/14/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 10:53:29 AM
Creation date
6/18/2021 10:03:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction Inc.
Approval Date
6/14/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement V
Public Works WO Number
UP3730
Tracking Number
0002953
Total Compensation
$1,924,004.26
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Thomco Construction Inc. 6/22/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> When the Bid proposed includes an item for "Traffic Control Labor," the Work covered <br /> by this item shall be for the labor actually used when authorized by the Engineer for: <br /> 1. The services of flaggers at both ends of a 2-way, single lane operation; or <br /> 2. The services of flaggers at signalized intersections if off-duty uniformed police <br /> officers are not available, or when otherwise specifically directed by the <br /> Engineer. <br /> The hours eligible for"Traffic Control Labor" shall be for the hours actually worked, plus <br /> 1 hour of on-site orientation per flagger. "Show-up time" will not be counted. The labor <br /> to perform the Work described in the item"Maintenance and Protection of Traffic Control" <br /> is specifically excluded from this Work. No adjustment will be made to the unit price for <br /> "Traffic Control Labor" for overtime or holiday hours worked. <br /> 1-10.3(4)A Traffic Control - Off-Duty Police Officer <br /> Contractor shall provide off-duty uniformed Police Officer for traffic control at all <br /> signalized intersections. Acceptable sources for off-duty uniformed Police Officers <br /> are as follows in order of preference: <br /> 1. City of Everett Police Department, contact either, <br /> a. Officer Mike Bernardi, (425) 327-9119 <br /> b. Officer Mike Drake, (425) 244-0025 <br /> 2. Puget Sound Executive Service, 625 B 5th Ave, Ste 4, Sequim, WA <br /> 98382 <br /> a. Contact Nick Janssen, (360) 681-7737 <br /> 1-10.3(5) Construction Signs <br /> ' All signs required by the approved traffic control plan(s) as well as any other appropriate <br /> signs prescribed by the Engineer will be furnished by the Contractor and be paid under <br /> the item "Maintenance and Protection of Traffic Control." The Contractor shall erect <br /> them on posts or supports and maintain them in a clean, neat, and presentable condition <br /> until the necessity for them has ceased. All non-applicable signs shall be removed or <br /> covered with either metal or plywood during periods when they are not needed. When <br /> the need for any of these signs has ceased, the Contractor, upon approval of the <br /> Engineer, shall take down these signs, posts, or supports. All signs, posts, and supports <br /> shall be removed from the project and shall remain the property of the Contractor. <br /> There shall be no separate classification of signs. All construction signs, whether used <br /> throughout the construction, during a major phase of construction or removed daily shall <br /> be paid under the item "Maintenance and Protection of Traffic Control." Portable or <br /> temporary mountings may require added weight for stability. If it is necessary to add <br /> weight to the signs, only a bag of sand that will rupture on impact shall be used. The <br /> bag of sand shall have a maximum weight of 40 pounds and shall be suspended no <br /> more than 1-foot from the ground. <br /> The Work to provide the construction signing shall be: <br /> 1. Furnishing all construction signs. <br /> 2. Furnishing, removing, and disposing of the posts or supports for the signs. <br /> 3. Initial installation and subsequent removal of all construction signs. <br /> 4. Furnishing labor and materials for maintaining the signs in a clean and <br /> presentable condition; <br /> 5. All other incidentals necessary for providing the construction signs according <br /> to the approved traffic control plan(s). <br /> Water Main Replacement"V" Division 1 -GENERAL REQUIREMENTS April,2021 <br /> WO No-UP3730 SP-127 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.