My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Thomco Construction Inc. 6/14/2021
>
Contracts
>
Capital Contract
>
Thomco Construction Inc. 6/14/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 10:53:29 AM
Creation date
6/18/2021 10:03:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction Inc.
Approval Date
6/14/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement V
Public Works WO Number
UP3730
Tracking Number
0002953
Total Compensation
$1,924,004.26
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Thomco Construction Inc. 6/22/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> Plug existing connecting pipes that remain by filling with Commercial Concrete a <br /> minimum length of 24—inches into the pipe. Backfill shall be Gravel Borrow as <br /> specified in 9-03.14(1). Compact backfill to a minimum of 95 percent maximum <br /> density in accordance with 2-03.3(14)D. <br /> ' 2-02.3(4) Obliteration of Pavement Markings <br /> (******) <br /> Remove pavement markings where shown on the Plans or where designated by the <br /> Engineer. Obliterate pavement marking until blemishes caused by the pavement <br /> marking removal conform to the coloration of the adjacent pavement. If the pavement <br /> is materially damaged by pavement marking removal operation, Contractor shall repair <br /> the pavement damage, at the Contractor's expense, to a condition equal to existing <br /> pavement that had no markings obliterated. Remove sand or other material deposited <br /> on the pavement as a result of removing stripes and markings as the Work progresses <br /> to avoid hazardous conditions. Accumulation of sand or other material that might <br /> interfere with drainage will not be permitted. <br /> 2-02.3(5) Abandon Pipe In-place <br /> (******) <br /> Plug pipe ends of pipes designated on Plans being abandoned in-place using <br /> commercial concrete. If designated on Plans, fill abandoned in-place pipe with <br /> Controlled Density Fill as specified in 2-09.3(1)E. <br /> ' 2-02.3(6) Sawing and Line Drilling <br /> (******) <br /> Saw-cut to full depth mortared decorative or special pavement including, but not limited <br /> to, brick, cobblestone or paver block along a neat line with intent of salvaging as many <br /> units as possible. <br /> When line drilling, drill holes at maximum center-to-center spacing of six-inches. Drill <br /> holes perpendicular to the surface and penetrate completely through the pavement. <br /> When the Plans indicate, or the Engineer requires, saw-cutting pavement that is <br /> comprised of a rigid base and asphalt overlay, saw cut the rigid base to the minimum <br /> depth as follows: <br /> a. For concrete rigid base, saw cut to a depth of 2/3 the thickness of the rigid <br /> base. <br /> ' b. For rigid base constructed with mortared decorative or special pavement <br /> including, but not limited to, brick, cobblestone, or paver block, or a <br /> combination of such materials saw cut to full depth of the rigid base along a <br /> neat line with intent to salvage as many special pavement units as possible. <br /> 2-02.3(7) Salvage <br /> (******) <br /> ' Carefully salvage and deliver to the Owner in good condition, all materials of <br /> recoverable value taken from the discarded facilities, unless otherwise indicated. <br /> Materials and things deemed of no value by the Engineer shall become the <br /> Contractor's property to be removed and properly disposed. <br /> Remove excess concrete, debris and dirt from castings and other materials the <br /> Engineer designates suitable for salvage and that are not to be re-used elsewhere on <br /> the Project. Deliver salvage castings and materials to the location designated by the <br /> Engineer. <br /> Watermain Replacement"V" Division 2—EARTHWORK April,2021 <br /> WO No.—UP3730 SP—133 <br />
The URL can be used to link to this page
Your browser does not support the video tag.