I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> - 1 <br /> 2-02.3(8) Waste Disposal <br /> Provide waste site for disposal of materials not required for construction. Arrange <br /> waste disposal at no expense to the City. Waste disposal shall meet the requirements <br /> of 2-03.3(7)C of the Standard Specifications. <br /> 2-02.3(9) Abandon Existing Water Valves In-place <br /> (******) <br /> Prior to abandoning existing water valves in-place, coordinate with City to have City , <br /> forces close valve. After City forces verify valve is closed, remove valve box and <br /> extension, if any, and backfill with Gravel Borrow as specified in 9-03.14(1). Compact <br /> backfill to a minimum of 95 percent maximum density in accordance with 2-03.3(14)D. <br /> 2-02.4 Vacant <br /> Revise 2-02.4 as follows: <br /> 2.02.4 Measurement <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> For curb and gutter cement removal with concrete pavement, the curb and gutter will <br /> be considered as pavement removal and the measurement for payment will be to the <br /> back of the curb. , <br /> 2-02.5 Payment <br /> Delete all paragraphs in 2-02.5 and substitute the following: <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> If there is no bid item to cover pavement removals, then they shall be included with the <br /> construction of the respective Work including, but not limited to, water main, water <br /> service line, and underground utility vaults. <br /> Include curb and gutter and sidewalk removal with construction of the respective Work <br /> including, but not limited to, water main, water service line, and underground utility <br /> vaults with no direct compensation made. <br /> If there is no pay item for pipe abandonment, then it shall be included with the <br /> construction of the respective Work including, but not limited to, water main, with no <br /> direct compensation made. <br /> If there is no pay item for existing valve abandonment, then it shall be included with the I <br /> construction of other items of Work with no direct compensation made. <br /> 2-03 ROADWAY EXCAVATION AND EMBANKMENT <br /> 2-03.1 Description <br /> Supplement 2-03.1 by adding the following: <br /> This Work applies to street pavement patching and street reconstruction after <br /> completion of utility work. Grading for street reconstruction shall conform to COE <br /> Standard Drawing No. 302, unless otherwise noted on the Plans. Grading for <br /> pavement patching shall conform to COE Standard Drawing No. 326, unless otherwise <br /> noted on the Plans. <br /> 2-03.2 Vacant <br /> Revise 2-03.2 as follows: <br /> Watermain Replacement"V" Division 2—EARTHWORK April,2021 <br /> WO No.—UP3730 SP—134 <br /> 1 <br />