My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Thomco Construction Inc. 6/14/2021
>
Contracts
>
Capital Contract
>
Thomco Construction Inc. 6/14/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 10:53:29 AM
Creation date
6/18/2021 10:03:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction Inc.
Approval Date
6/14/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement V
Public Works WO Number
UP3730
Tracking Number
0002953
Total Compensation
$1,924,004.26
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Thomco Construction Inc. 6/22/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> required by the Engineer and replace the unstable material with Foundation <br /> Material Class A or B. I <br /> Place Foundation Material Class A or B in layers not more than six inches <br /> thick and compact to minimum of 90-percent maximum density as determined <br /> by 2-03.3(14)D. <br /> Dispose of unsuitable material removed to make room for foundation material <br /> by hauling to a waste site obtained and provided by the Contractor in <br /> accordance with 2-03.3(7)C. I <br /> 2-09.3(1)D Disposal of Excavated Material <br /> Delete the second paragraph in 2-09.3(1)D and substitute the following: <br /> All costs for disposing of excavated material, whether within the Project limits111 <br /> or hauled to a disposal site, shall be incidental to the other Bid items in the <br /> Proposal. The City will not pay for hauling. Disposal of excavated material <br /> shall meet the requirements of 2-03.3(7)C. I <br /> 2-09.3(1)E Backfilling <br /> Delete the fourth paragraph in 2-09.3(1)E and substitute the following: <br /> Provide CDF having minimum 28-day strength of 50 psi and maximum 28-day <br /> strength not to exceed 300-psi. Provide wet or flowable CDF with <br /> consistency having approximate slump between three to ten inches. <br /> Controlled Density Fill used for excavation backfill may be placed dry or wet. I <br /> Use wet, or flowable, CDF for filling abandoned pipes in-place. <br /> Supplement 2-09.3(1)E by adding the following: <br /> Where CDF is used in lieu of other materials such as foundation material, <br /> gravel borrow, washed sand or crushed surfacing top course, the respective <br /> limits for trench width or backfill dimensions shall be approved by the <br /> Inspector. I <br /> 2-09.3(3)B Excavation Using Open Pits — Extra Excavation <br /> Revise the sixth paragraph to read as follows: <br /> Submittals and Design Requirements — The Contractor shall submit Type <br /> 3E Working Drawings with supporting calculations showing the geometry and <br /> construction sequencing of the proposed excavation slopes. <br /> 2-09.3(3)D Shoring and Cofferdams <br /> Revise the fifth paragraph to read as follows: <br /> Submittals and Design Requirements — The Contractor shall submit Type <br /> 3E Working Drawings with supporting calculations showing the proposed <br /> methods and construction details of structural shoring or cofferdams in <br /> accordance with Sections 1-05.3 and 6-02.3(16). <br /> 2-09.4 Measurement <br /> Delete all paragraphs in 2-09.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 2-09.5 Payment <br /> Delete all paragraphs in 2-09.5 and substitute the following: <br /> Watermain Replacement"V" Division 2—EARTHWORK April,2021 <br /> WO No.—UP3730 SP—138 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.