My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Thomco Construction Inc. 6/14/2021
>
Contracts
>
Capital Contract
>
Thomco Construction Inc. 6/14/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 10:53:29 AM
Creation date
6/18/2021 10:03:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction Inc.
Approval Date
6/14/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement V
Public Works WO Number
UP3730
Tracking Number
0002953
Total Compensation
$1,924,004.26
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Thomco Construction Inc. 6/22/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> 1. Use only those agency designated hydrants in strict accordance with City's <br /> requirements for hydrant use. Obtain a temporary hydrant permit from the <br /> City's Public Works Department Water Division. Temporary hydrant permits <br /> are available for a $1,200.00 deposit by contacting the City of Everett's Utility <br /> Billing at 425-257-8999 from 8:00 a.m. to 5:00 p.m. Monday through Friday. <br /> Deposit is refundable. Provide backflow prevention assembly approved by <br /> the City. <br /> 2. Secure permission from and comply with all requirements of the City's water <br /> utility before obtaining water from the fire hydrants. Notify the Engineer of <br /> City's permission as soon as granted. <br /> 3. Use hydrant wrenches only to open hydrants. Make certain the hydrant valve <br /> is fully open because "cracking" the hydrant valve causes damage to the <br /> hydrant valve. Provide an approved auxiliary valve on the outlet line for <br /> control purposes. Close fire hydrant valves slowly to avoid a surge in the <br /> ' system that creates excess pressure on water lines. Carefully note the <br /> importance of following these directions. <br /> 4. If Contractor's employees use the wrong wrench to open a hydrant causing <br /> ' damage the hydrant valve stem or operating nut or both, the Contractor shall <br /> be responsible for costs associated with repairing the damaged hydrant valve <br /> stem or operating nut or both. Immediately notify the City's water utility so <br /> that the damage can be repaired as quickly as possible. <br /> 5. Notify City water utility immediately upon completing the use of the hydrants <br /> so the hydrants may be inspected for possible damage. City water utility will <br /> repair damage resulting from the use of the hydrants by the Contractor. <br /> Contractor shall be responsible for repair cost and cost, if necessary, shall be <br /> withheld from the final payment to the Contractor. <br /> 6. City water utility will fine Contractor for violation of these requirements. <br /> Contractor shall also be liable for damage suits resulting from malfunctioning <br /> of Contractor damaged fire hydrants not being operational in the event of fire. <br /> 7. There will be no charge for the volume of water used. <br /> 2-07.4 Measurement <br /> Revise 2-07.4 to read as follows: <br /> Water will not be measured. <br /> 2-07.5 Payment <br /> Revise 2-07.5 to read as follows: <br /> All costs for the Work described in Section 2-07 shall be included with the Work with no <br /> direct compensation made. <br /> 2-09 STRUCTURE EXCAVATION <br /> ' 2-09.2 Materials <br /> Supplement 2-09.2 by adding the following at end of the materials list: <br /> Foundation Material Class A or B 9-03.17 Standard Specifications <br /> 2-09.3 Construction Requirements <br /> 2-09.3(1) General Requirements <br /> 2-09.3(1)C Removal of Unstable Base Material <br /> Delete all paragraphs in 2-09.3(1)C and substitute the following: <br /> When the material at the bottom of an excavation is not stable enough to <br /> ' support the Structure, the Contractor shall excavate below grade to the depth <br /> Watermain Replacement"V" Division 2—EARTHWORK April,2021 <br /> WO No.—UP3730 SP—137 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.