My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Thomco Construction Inc. 6/14/2021
>
Contracts
>
Capital Contract
>
Thomco Construction Inc. 6/14/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 10:53:29 AM
Creation date
6/18/2021 10:03:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction Inc.
Approval Date
6/14/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement V
Public Works WO Number
UP3730
Tracking Number
0002953
Total Compensation
$1,924,004.26
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Thomco Construction Inc. 6/22/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> For the Bid Item Commercial HMA, select a class of HMA and design level of <br /> Equivalent Single Axle Loads (ESAL's) appropriate for the required use. <br /> 5-04.2(2)B Using Warm Mix Asphalt Process <br /> The Contractor may elect to use additives that reduce the optimum mixing <br /> temperature or serve as a compaction aid for producing HMA. Additives include <br /> organic additives, chemical additives and foaming processes. The use of <br /> Additives is subject to the following: <br /> ' a. Do not use additives that reduce the mixing temperature more than <br /> allowed in Section 5-04.3(6) in the production of mixtures. <br /> b. Before using additives, obtain the Engineer's approval using WSDOT <br /> ' Form 350-076 to describe the proposed additive and process. <br /> 5-04.3 Construction Requirements <br /> 5-04.3(1) Weather Limitations <br /> Do not place HMA for wearing course on any Traveled Way beginning October 1st <br /> through March 31st of the following year without written concurrence from the <br /> Engineer. <br /> Do not place HMA on any wet surface, or when the average surface temperatures are <br /> less than those specified in Table 1, or when weather conditions otherwise prevent the <br /> proper handling or finishing of the HMA. <br /> ' Table 1 - Minimum Surface Temperature for Paving <br /> Compacted Thickness(Feet) Wearing Course Other Courses <br /> Less than 0.10 55°F 45°F <br /> ' 0.10 to .20 45°F 35°F <br /> ' More than 0.20 35°F 35°F <br /> 5-04.3(2) Paving Under Traffic <br /> Apply the requirements of this Section when the Roadway being paved is open to <br /> ' traffic. <br /> Keep intersections open to traffic at all times, except; when paving the intersection or <br /> ' paving across the intersection. During such time, and provided that there has been an <br /> advance warning to the public, the intersection may be closed for the minimum time <br /> required to place and compact the mixture. In hot weather, the Engineer may require <br /> the application of water to the pavement to accelerate the finish rolling of the pavement <br /> ' and to shorten the time required before reopening to traffic. <br /> Before closing an intersection, place advance warning signs and signs marking the <br /> detour or alternate route. <br /> During paving operations, maintain temporary pavement markings throughout the <br /> project. Install temporary pavement markings on the Roadway prior to opening to <br /> traffic. Provide temporary pavement markings in accordance with Section 8-23. <br /> Include all costs in connection with performing the Work in accordance with these <br /> requirements, except the cost of temporary pavement markings, in the unit Contract <br /> prices for the various Bid items involved in the Contract. <br /> ' Water Main Replacement"V" Division 5-SURFACE TREATMENTS April,2021 <br /> WO No.-UP3730 AND PAVEMENTS <br /> SP-147 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.