My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Thomco Construction Inc. 6/14/2021
>
Contracts
>
Capital Contract
>
Thomco Construction Inc. 6/14/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 10:53:29 AM
Creation date
6/18/2021 10:03:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction Inc.
Approval Date
6/14/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement V
Public Works WO Number
UP3730
Tracking Number
0002953
Total Compensation
$1,924,004.26
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Thomco Construction Inc. 6/22/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> 5-04.2(1)A Vacant <br /> 5-04.2(2) Mix Design —Obtaining Project Approval <br /> Do NOT begin paving prior to the approval of the mix design by the Engineer. <br /> Nonstatistical evaluation will be used for all HMA not designated as Commercial <br /> HMA in the Contract Documents. <br /> Commercial evaluation will be used for Commercial HMA and for other classes of <br /> HMA in the following applications: sidewalks, road approaches, paths, trails, and <br /> pavement repair. Obtain approval from Project Engineer for other nonstructural <br /> applications of HMA accepted by commercial evaluation. Sampling and testing of <br /> HMA accepted by commercial evaluation will be at the option of the Project <br /> Engineer. The Proposal quantity of HMA that is accepted by commercial <br /> evaluation will be excluded from the quantities used in the determination of <br /> nonstatistical evaluation. <br /> Nonstatistical Mix Design. Provide fifteen days prior to the first day of paving <br /> one of the following mix design verification certifications for City review; <br /> a. The WSDOT Mix Design Evaluation Report from the current WSDOT <br /> QPL, or one of the mix design verification certifications listed below. <br /> b. The proposed HMA mix design on WSDOT Form 350-042 with the seal <br /> and certification (stamp & signature) of a valid licensed Washington State <br /> Professional Engineer. <br /> c. The Mix Design Report for the proposed HMA mix design developed by a <br /> qualified City or County laboratory that is within one year of the approval <br /> date.** <br /> **The mix design shall be performed by a lab accredited by a national <br /> authority such as Laboratory Accreditation Bureau, L-A-B for Construction <br /> Materials Testing, The Construction Materials Engineering Council (CMEC's) <br /> ISO 17025 or AASHTO Accreditation Program (AAP) and shall supply <br /> evidence of participation in the AASHTO: resource proficiency sample <br /> program. <br /> Mix designs for HMA accepted by Nonstatistical evaluation shall; <br /> a. Have the aggregate structure and asphalt binder content determined in <br /> accordance with WSDOT Standard Operating Procedure 732 and meet <br /> the requirements of Sections 9-03.8(2), except that Hamburg testing for <br /> ruts and stripping are at the discretion of the Engineer, and 9-03.8(6). <br /> b. Have anti-strip requirements, if any, for the proposed mix design <br /> determined in accordance with AASHTO T 283 or T 324, or based on <br /> historic anti-strip and aggregate source compatibility from previous <br /> WSDOT lab testing. <br /> At the discretion of the Engineer, City may accept verified mix designs older than <br /> 12 months from the original verification date with a certification from the <br /> Contractor that the materials and sources are the same as those shown on the <br /> original mix design. <br /> Commercial Evaluation: Approval of a mix design for"Commercial Evaluation" will <br /> be based on a review of the Contractor's submittal of WSDOT Form 350-042 (For <br /> commercial mixes, AASHTO T 324 evaluation is not required) or a Mix Design <br /> from the current WSDOT QPL or from one of the processes allowed by this <br /> section. Testing of the HMA by the City for mix design approval is not required. <br /> Water Main Replacement"V" Division 5—SURFACE TREATMENTS April,2021 <br /> WO No.—UP3730 AND PAVEMENTS <br /> SP-146 <br />
The URL can be used to link to this page
Your browser does not support the video tag.